Share on (62038922729):
| Fabric | 100% nylon(Non-stretch fabric)+Inclusive of our 6% spandex |
| size of fan | 70x33mm |
| The output voltage | 5V |
| color | many |
| Product Keywords | air conditioned work shirt |
*. Fabric: fabric :100% nylon(Non-stretch fabric)
*Color: Pink, gray, sky blue (male), fluorescent green (male), rose red (female), yellow (female), black (male), dark green (male), dark green (male), color blue (male), military yellow (male), fluorescent green (female), sky blue (female), yellow (male), emerald blue (male)
* Removable USB fan, supporting all 5V mobile power supply on the market
*2 pcs fan -size-(70x33mm) *Stinger proof, waterproof, sun protection
WHAT IS THE DESIGN CONCEPT?
Two fans supply fresh air fast by battery in apparel in hot summer: make sweat evaporate quickly and reduce the body heat. To help people live in comfortable daily life in hot conditions.
HOW ARE PRODUCT PERFORM?
Blowing gently, comfortable wind, harmless, fast cooling,
Reduce skin problems caused by too much sweat.
Prevent the temperature too high lead to heat stroke.
WHERE TO USE?
HOT conditions indoor and outdoor
Such as the kitchen, the construction, express delivery, the traffic police, repair, sanitation, electricity, steel, railways, oil and so on environment, drivers and outdoor sports and leisure travelers.
Features:
Fan: 2 PC
3 levels can be adjustable:
Time Duration formula: (power capacity supply× voltage)÷air fan power consumption (depends on wind speed level) = time duration (hours)
such as power supply-4400mAh, the time duration is: 4400mAh × 5V = 22000 ma (22 A) ÷2.3 W= 9.5H
INSTALLATION:
1.Put the cover of fan inside of hole on clothing for the fan, and put on the base of fan, then rotate thread of the two parts to fix. (Recommend to rotate cover part to avoid cable winding)
2. Connect the power supply with USB connect, turn on the power supply
3. Press the power button on controller for 5 seconds, the fan starts to work.
4. Choose the wind level you need (High/Medium/Low option)
APPAREL WASHING:
Take off the fan gently, Washing clothes only






Standard export carton packing.
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
New products from manufacturers at wholesale prices