tiger rig Full scale drilling and well control simulator Oil drilling rig teaching simulator

Share on (62045294844):


Price:

Quantity:


Product Overview

Description





Product Description




Specification




Packing & Delivery




We attended the American TOC Oil Show in Houston


FAQ







specification
Drilling & Well-control VR Simulator

Operation Function Instruction
I、 HMIHMI Operation Interface
Main Interface
Well-Control Accident Training Interface
Tripping
Drilling Interface
TD Interface
MP Interface
Protect and Correct Parameters Setting
Correct Parameters Setting
The Motor Running Time Back to Zero
The Motor Running Time Back to Zero
Fault and Alarm

II、 Drilling Operation(TD)
1. Normal Operation

Pick up stands operation
Break out the stand operation
Drilling Operation
Drill-down operation
Tripping Operation

2. Well-control Operation

Drilling Overflow Shut-in Operation
Drill Pipe Shut-in Operation
Drill Collar Shut-in Operation
Empty Well Shut-in Operation
Driller's Well Killing Operation
Waiting and Weighting Well Killing Operation

3. Accident Operation

Slacking off Operation
Tripping blocked Operation
Sand sticking Operation
Differential Pressure Sticking
Key Seating Sticking
Balling up sticking
Hole caving sticking
Bit bouncing
Leakage Zone Drilling Operation
Leakage Zone Drilling Operation

III、Drilling Operation(RT)
1. Normal Operation

Pick up stands operation
Break out the stand operation
Drilling Operation
Drill-down operation
Tripping Operation

2. Well-control Operation

Drilling Overflow Shut-in Operation
Drill Pipe Shut-in Operation
Drill Collar Shut-in Operation
Empty Well Shut-in Operation
Driller's Well Killing Operation
Waiting and Weighting Well Killing Operation

3. Accident Operation

Slacking off Operation
Tripping blocked Operation
Sand sticking Operation
Differential Pressure Sticking
Key Seating Sticking
Balling up sticking
Hole caving sticking
Bit bouncing
Leakage Zone Drilling Operation
Leakage Zone Drilling Operation

IIII、 teacher work table
Student Information Management Interface
Training Subjects Selection
MP Parameter Setting


Company Profile


1. What is the delivery time of the rig?
Delivery time is about three months to half a year, so please be patient.

2. Can I provide on-site installation services?
Yes, we will send 5-7 drilling engineers to the site for installation, which will take about a week to complete.

3. Can I be your tiger agent in our country?

Answer: We are developing agents all over the world; you can sign agency agreement with us.

4. Q: What is the warranty time of your products?
R: The warranty time is 12 months from the date of the commissioning. After the warranty, any questions and needs, please
contact us.

5. How many years is your factory?

We have our own factory; we have more than ten years’ history


0.1973 s.