Share on (62060083523):
High and Low Temperature Resistance Quick-setting Rubber Asphalt Waterproof Coating

Two-component spray quick-release rubber asphalt waterproof coating, A component as the main agent, by the anionic synthetic rubber emulsion and the use of special technology made of emulsified asphalt emulsion and a variety of chemical additives mixed to complete, the component is rubber continuous Phase, asphalt for the dispersed phase of the core-shell structure, the solid content is higher, low viscosity, suitable for spraying construction. The B component is a coagulant and is prepared by treating the metal salt electrolyte into the corresponding concentration of aqueous solution.


| Type | Rubber Asphalt Waterproof Coating |
| Main Raw Material | Rubber Asphalt |
| Package | 10kg, 20kg/barrel |
| Temperature resistance | -40~160 Centigrade |
| Application Method | Scraper, Spray, Roll, Brush |
| Color | Black |
| Feature | Eco Friendly, deliberate resistance, chemically resistance, weather resistance, etc. |
| Application | Roof, basement, pool, subway, tunnel, etc. |
Note:
The parameter above is fit for the regular products and price, it is not availble for the clients customized requirments.

1. New and old building roof, basement, bathroom, swimming pool, pipeline, warehouse, bridge, playground, etc.
2. Substrate made of concrete, wood, glass, ceramic, cement mortar, etc.

1) Use dry cloth to clean the surface of insulator before using, then it can be operated in good weather.
2) Spray on clean and dry surface when operating, the coating thickness should be over 0.25mm, holidays should be avoided.
3) The tack free time would be about 30 minutes, and the completely cured time would be 24 hours after operation.
Attention:
1) Do not construct under 5°C.
2) Add a certain proportion of drier to ensure the curing time in low temperature.(Please ask technical support department for details.)
3) Please wear protective clothing when you are working in order to avoid the coating contacting skin and eye .Keep ventilate.
4) The coating must be tightly preserved if not running out.
5) Do not construct sleet and sand blown by the wind.Avoid constructing in high temperature at noon(prevent the coating bubbling and becoming sticky to feet).
6) The products should be sealed storage in ventilated and shade place.Keep away form fire.






New products from manufacturers at wholesale prices