Stainless Steel Manhole Covers,manhole cover Galvanized stainless steel

Share on (62063878063):


Price:RUB 382.56

Quantity:


Product Overview

Description

 

.Our main range of manhole covers with aluminium and stainless steel materials provide internally and externally use for floor,road,driveway,garden or show rooms and other areas where the best aesthetic finish is required.


.Frame & cover are made of extruded aluminium profile and galvanized stainless steel


.Easy to lift with threaded lifting keys

 

.We can follow your dimentions and requirements per your design.

 

 

 

 

 

experieces.jpg

Product Description

  

 

Product Name:stainless steel manhole covers & frames
Material:Aluminium,stainless steel
Size:Customized
Tolerance:±0.1mm
Process:CNC Machining,Stamping,Welding,Cutting,Bending,Punching,Drilling, 3D Laser,Milling,Forging, Heat treament,Other Machining Services
Color:Customized
Surface treatment:Zinc plated, anodized,galvanized,Powder coating or customized
Packing:PP bag,carton case,pallets,or according to customer's requirements
Product capacity:50000 Pieces per Month
MOQ:10 Pieces
Lead time:15~30days
Brand:Customized
Standard:ISO9001:2008
Applications:floor,road,driveway,garden,park,Industry,Construction and public use,etc.
Place of Origin:Zhejiang,China (Mainland)
Service Provided: OEM/ODM/Customized/Design
Port of loading:Shanghai/Ningbo,China (Mainland)
Machining Equipment:Laser Cutting Machine/CNC Machine/Flat Bed Spot-welder/Die Grinder/Steel Processing Machine/drilling Machine/bending Processing Machine/etc.
Company Experience:11 years

 

 manhole covers 1.jpg

 

 

 

 

Company Information

about us.pngHTB1.jpgHTB1iXF2Xsfr.jpg 

FAQ

Q:Are you trading company or manufacturer ?

A:We are factory.

 

Q:How long is your delivery time?

A:Generally sample and mould need 15-20 days and after sample approved, the mass production need 20-30 days.

 

Q:Do you provide samples ? is it free or extra ?

A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

 

Q:What is your terms of payment ?

A:Mould cost need 100% prepaid and mass production need 30% deposite, and the balance before the shipment.

 

 

 

 

 

 

 

 

 

 

0.0852 s.