Share on (62089795626):
1) Features | •Snowing •Lighting •Rotating •Musical |
2) Item | Snowing Christmas Windmill Lantern |
3) Item No. | W16032Yr-R |
4) Size | 16*16*38.5 cm |
5)Weight | About 1.2kg |
6) Material | PVC, Resin, ABS, Metal |
7) Color | Red Lamp |
8) MOQ | 204 pcs per color |
9) Production capacity | 15000 pcs one month |
10) Packing | 1 pc/ colour box, 6 pcs / outer carton carton size :58*35.5*37.5(cm) |
11) QTY | 2550 pcs / 20'GP, 5130 pcs / 40'GP, 6000 pcs / 40'HQ |
12) Sample lead time | 3 days |
13) Production lead time | 50 days after receipt of L/C or T/T 30% deposit or depend on the quantity. |
14) Payment term | L/C or T/T |
15) QC | Third party inspection is acceptable, 1 year guarantee for quality problems. |
16)Production introduction | 1.Traditional appearance, smart designs. 2.We bring the snowing scene inside, snow continuously falls. 3.Illuminated by LED lights. 4.Control the songs by on/off switch freely. 5.Amazing Christmas gifts, could be placed on the table, fireplace. 6.Inside various figures and outside colors upon requirement. 7.Windmill rotates at a constant speed. 8.Operated by adaptor, or 3AA batteries. 9.Well packed with polyfoam, and a beautiful color box as gift box. |
















Can we have our own design? How about the sample charge and sample leading time?
A:OEM design will be welcomed, we can develop for you.The sample fee will be charged based on the exact items, which will be refunded from future orders
Can we visit your Company?
A:Welcome to visit our company. Our company is in nanjing. It's only a 10-minute drive from nanjing airport.We will arrange the car to pick you up after having the schedule
How do your factory do regarding quality control?
A: Quality is 1st priority. We always attach great importance to quality controling from raw material to shipping. Our factory has gained TUV Rheinland and BSCI certificates,IS09001
What is the normal lead time?
A: We will send products to you within 10-15 days after receiving your payment.For customized products, the delivery time is 50-60 days after receiving your payment. That is dependent on the total quantity required.
What's the final price?
A:The final price should be according to you requests, such as the quantity, the more the cheaper.If you are not sure the requests, pls contact us, we will give you professinal suggestions as per your usage and local market situation.