Share on (62120198889):
Cheap Spot Welder 2mm Sheet Metal Spot Welding Machine 25kva Spot Welding Machine



Adopt the vertical compression institution , easy to operate , reflect is fast, which suit to all kinds of the accurate positioning and the complex shape of the welding occasions.
Microcomputer control system , precise control of the welding time and welding current, easy to adjust.
High conduction magnetism silicon , secondary whole structure, output current is high, energy-saving and protect environmental .
Water-transformer, water-, and water-electrode what can improve the use life of equipment.
It is used to high quality welding wide range of net type, plate type, hardware ,handiwork and so on.
Main technology parameter
| Item No | The rated voltage | Power | Rated Duty Cycle | Electrode trip | The thickness of the welding machine | |
| Low carbon plate | Low carbon steel wire | |||||
| DN-16 | 380V, Single phase | 16KVA | 20% | 240-350 | 1.8+1.8MM | 4MM+4MM |
| DN-20 | 380V, Single phase | 20KVA | 20% | 240-350 | 2MM+2MM | 5MM+5MM |
| DN-25 | 380V, Single phase | 25KVA | 20% | 240-350 | 2.2+2.2MM | 6MM+6MM |
| DN-35 | 380V, Single phase | 35KVA | 20% | 240-350 | 2.5+2.5M | 7MM+7MM |
| DN-40 | 380V, Single phase | 40KVA | 20% | 240-370 | 2.8+2.8MM | 7.5+7.5MM |
| DN-50 | 380V, Single phase | 50KVA | 20% | 240-370 | 3.0+3.0MM | 8MM+8MM |







1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.
New products from manufacturers at wholesale prices