Share on:
Our plastic formwork have passed the quality certificate GB-ISO9001:2008, we have the quality garantee.
1.Use the hollow building formwork intersecting surface laid with 15mm thick.
2.Wood square of the distance: (1) on the surface of the intersection (spacing: wood square distance according to the thickness of the slab concrete, in general, the thickness of less than 0.15 m floor (spacing is 200 ~ 250 mm.(2) the shear wall (spacing according to adjust the spacing, height and thickness of the wall to wall height of 2800 mm, 300 mm
thick wall, for example, using the formwork (15 mm thickness spacing is 100 ~ 150 mm, if the shear wall, pillar width more than 1 meter, must add the fixed frame.
3.Die shear wall and column puzzle when leaving no gaps, internal Angle (the bottom of the wall) parts must have wood square, beam, wall, formwork connection.Shear wall made 4 after the mold must be assembled into the whole hoisting, then lay flat, reduce labor intensity, forming effect is good.
4. When the nail to the formwork from the formwork edge distance 15 ~ 30 mm, strength wants moderate, nail nails is 40 ~ 50 mm in length, shoulds not be too long or too short.
5.Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance, it does not leak slurry and wallboard material saving.
1.Q: Are you a factory or trading company?
A: We are a factory of plastic formwork.
2.Q: Where is your factory located? and how can I come to visit ?
A: Our factory is located in Cangzhou City, in China. You can go to the cangzhou high-speed railway station directly, and we will pick you up. All our clients from home and abroad, are warmly welcome to visit us!
3.Q: How can I get some samples?
A: We are honored to offer you free samples.
4.Q: How does your factory control quality?
A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO9001:2008.
5.Q: How many times does your formwork reused?
A:It can be reused over 60 times.
6.Q: Does this formwork stick concrete? and easily remove or not?
A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.
7.Q: How to clean the used formwork?
A: Only using the high-pressure water gun can make it clean.
8. Q: what are your foreigh markets?
A: Middle East countries, Africa countries, the eastern European countries,Oceania countries
item | value |
Warranty | 3 years |
After-sale Service | Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement |
Project Solution Capability | graphic design, 3D model design, total solution for projects, Cross Categories Consolidation |
Application | Office Building |
Design Style | Minimalist |
Place of Origin | China |
Material | PP Plastic |
Product name | plastic shutter formwork |
Type | Plastic Construction Formwork |
Usage | Concorete wall shuttering board Formwork |
Color | white |
Name | plastic concrete Formwork,plastic building formwork |
Size | 1220*2440*12 15 18 21 mm |
Weight | 31kg |
Advantage | reuse over 80~100 times, easily clean, no need oil. |
Application | Tall Building, floor foundation slabform, bridge, tunnel |
container loading(pcs) | ||||||
20HQ | 40HQ | |||||
1.22*2.44M | 12MM | 21±1KG | 587.8kg/m3 | 720 | 1200 | |
1.22*2.44M | 14MM | 24±1KG | 575.8kg/m3 | 620 | 1080 | |
1.22*2.44M | 15MM | 25±1KG | 559.8kg/m3 | 560 | 1100 | |
1.22*2.44M | 16MM | 27±1KG | 566.8kg/m3 | 500 | 936 | |
1.22*2.44M | 18MM | 29±1KG | 541.2kg/m3 | 480 | 880 |