Side by Side Farm Buggy UTV Diesel 4x4 with Oil Shock Damping Absorber (62139782790)

Share on:


Price:RUB 149,245.20
Price in USD:Details

Quantity:


Product Overview

Description

 Side by Side Farm Buggy UTV Diesel 4x4 with Oil Shock Damping Absorber  

Product Description

 Engine:  200cc, Single cylinder,4 stroke,air cooling, CVT    
Starting system: electric   
Drive train: chain 
Transmission:1 speeds forward / 1 reverse

Clutch: manual    
Brakes (Front/rear): Foot brake,four disc brake    
Absorber (Front/rear): Oil shock damping     
Tires(Front/rear): 21x7-10/20x10-10    
Fuel capacity: 9.5L    
Seat height: 500mm  

Wheel base: 1650mm    
Max power 10.5KW/7500RPM   
Max torque 17.6NM/5500rpm 
Ground clearance: 90mm    
Products size:2300x1300x900mm 
Max speed: 65km/h    
Max load capacity: 220Kgs    
1.G.W:270kgs  N.W:245KGS   
Package measure:2285mmx1290mm8600mm 
Qty/20Fcl:8pcs  
Qty/40HQ: 18pcs 

Product Overview

1 (1).jpg1 (3).jpg1 (4).jpg1 (7).jpg1 (8).jpg1 (9).jpg1 (10).jpg1 (12).jpg

 

utv (2).jpgutv (4).jpgutv (5).jpg

Packaging & Shipping

 utv (6).jpgutv (7).jpgutv (8).jpg

 

 

Customer Show

utv (1).jpg

 

Our Service

 1. OEM Manufacturing welcome: Product, Package... 
2. Sample order 
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the 
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer 
the solve way for you.

 

FAQ

  Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.

62139782790
0.0085 s.