hi tech waterproof epoxy injection Concrete Rubber Packers

Share on (62156691074):


Price:

Quantity:


Product Overview

Description


High Pressure hi tech waterproof  epoxy injection Concrete Rubber Packers

Low Pressure also available

Product Description

 

Injection packer, made of  Aluminum, it can work at 10 MPa / 1465 psi / 100 bar pressure, easy to use, easy to inject, can use at low temperatures; single component grouting, simple construction, easy to clean up. The sealing agent can be water base polyurethane, oil base polyurethane and epoxy resin. We have four normal sizes, 10*80mm, 13*85mm, 13*100mm, 13*150mm. All the other sizes are available. Long packer over 15cm is for loose structure;Short packer 8.5cm or 10cm is for dense structures.

 

 

TECHNICAL PRAMETER

 

1.            Type                           Aluminum injection packer

2.           Working Pressure        10MPa/1465 psi / 100 bar

3.           Normal Sizes     10*75mm,13*85mm,13*100mm,13*150mm

4.           Loose structure      15cm

5.           Dense structure      10cm

Injection packers.jpg

 

Normal Sizes

10*80mm

13*85 mm

13*100mm

13*150 mm

Net Weight

19 kgs

22.5 kgs

24.5 kgs

18kgs

Gross Weight

20 kgs

23 kgs

25 kgs

19kgs

Package

1500pcs/ carton

1000pcs / carton

1000pcs/carton

 

600pcs/carton

 

 

 

 

 

Application

 

Materials of Application

      Hydrophilic Polyurethane (WPU) and Hydrophobic Polyurethane (OPU) foam stop leakage agent, Epoxy Resin.

Notes when Grouting

a. Stop infusing if polyurethane does not emitting from the cracks after 5 minutes. And try again later. If not yet filled, should check whether the buried pipeline cross-drilled or floor have holes and so on.

b. Infusion should be closely watched gauge of work perfusion machine, if more than the rated pressure (45Mpa above), should be shut down, if pressure remained high, cracks should check whether the drilling cross with cracks.

 

Application Field

Subway Station, Tunnel, Culvert, Foundation Improvement, Soil Settlement, Reservoir, Port Project, Top Slab, Crack, Construction Join, Shrinkage Crack, Basement Hairline Crack, etc., water stop projects.

Transportation / Packing

Packing Size: 1500pcs/ Carton or 1000pcs/Carton

Transportation by Air: Arrival within 2-7 days upon receipt of payment,excluding weekends and holidays.

Transportation by Ship: Delivery within 2-5 days upon receipt of payment, excluding weekends and holidays.

Detail:40 cartons per pallet (1*1 M)

 

 


0.1895 s.