Share on:
Our Product :
13mm/20mm/ butyl rubber stopper for freeze-dry preparation bottle
Butyl rubber stopper for Freeze-Dry Preparation Bottle | Specification | Main size(mm) | |||
The Diameter of crown | Thickness of crown | Diameter of the neck | Total height | ||
20-B2a | 19.5 ± 0.2 | 3.0± 0.2 | 13.0± 0.1 | 8.7± 0.2 | |
13-D2 | 12.5± 0.2 | 2.0 ± 0.1 | 7.5± 0.1 | 10.0± 0.2 | |
20-D2a | 18.8±0.02 | 3.3± 0.2 | 13.2± 0.2 | 13.8± 0.3 |
Specification:20-D2a
Color: gray
Material: bromobutyl rubber and chlorobutyl rubber
Inner Packing: Double PE packing after washing (in 100-grade clean room)
Outer Packing:Corrugated carton
Origin:China
Scope of application:It is suitable for package of transfusion medicines in pharmaceutical industry.
Executive standard:Adapt standards of YBB00042005
We was established in 2001 as a company specialized in manufacturing many kinds of medicinal rubber stoppers. Taizhou Kanglong has become a major world role in the research, development, and manufacture fields of the medicinal rubber stopper products.
We have a 1500-square-meter enclosed working area, a 300,000-grade vulcanizing room, a 100,000-grade trimming room, a 10,000-grade cleaning room and a 100-grade packing room.
We have been exporting these stoppers to Sekisui Japan, Baxter USA more than 15 years. We also have built cooperation relationship with many medical companies.
1. How can we get sample to test quality before placing larger order ?
Very glad to tell you that our sample department can provide free sample for our customers to test quality.
Usually we will choose to ship sample by DHL,FEDEX,UPS or according you requirement.
Pls kindly tell us your company name ,delivery address,phone number and contact person for safe sample delivery.
2. Can you produce the stopper according to our design?
Yes ,we can open custom modle according to your own design
3. What is the normal lead time?
For sample order and popular products in stock, we can send goods to you within 1~3 days after receiving your payment.
For unique customized products, the lead time is within 15-45 days after receiving your payment.
4. What is your shipping terms?
For the order,we can arrange shipment by sea ,by air according to your requirement.
We will help you to choose the best efficient shipping way according to your detail requirement.
Thank you for you to visiting our shop.
If any question, pls contacts us.