Dastool 125mm/5 inch 1400W electric concrete tools with dust shroud for concrete surfacing finishing

Share on (62187567040):


Price:$40.00 - $43.00

Quantity:


Product Overview

Description


Product Description

Product Application

small corded manual surface grinding on concrete walls, joints and formwork
Surface finishing of concrete walls

Main Features

1) Simple structure in linear type ,easy in installation and maintation. 

2)Dedicated grinding system – purpose-built to deliver much higher productivity than conventional angle grinders

3)Ergonomic head grip – for full control and comfortable hold when working in any position
4)Speed selection for better control on every surface
5)Virtually dust-free when used with a compatible Hilti vacuum cleaner
6)Adjustable dust hood for grinding edges and corners
Rated Voltage 
120V / 230V. 
Rated input power 
1400w
Frequency 
50/60Hz
No load Speed
2800-11000rpm
Diameter
125mm
Our Service

Pre-Sales Service

* Inquiry and consulting support. 
* Sample testing support. 
* View our Factory.

After-Sales Service

* Training how to instal the machine, training how to use the machine. 
* Engineers available to service machinery overseas.

Packing & Delivery

MOQ: 500pcs for OEM; No minimum for Dastool Brand
FOB Port: Ningbo
Master  Carton Size: 37*35*30cm
PCS/CTN: 6
G.W/N.W: 15/14KGS

Related Products
\t\t\t\t\t\t\t\t\thot sale \t\t\t\t\t\t\t
\t\t\t\t\t\t\t\t\tAbout us \t\t\t\t\t\t\t

1. Are you a manufacturer or a trader?

     We are an industrial and trading company.

2. Where is your factory location in China? which port is nearest to you?

    Here is our address: DingTang Industry zone, TangYa Town, Jindong qu, Jinhua, Zhejiang, China.

     Nearest Port: NINGBO

3.Can you design and make the new products based on customer's requirements?

    Yes, we have experienced R&D department and professional engineers to customize versatile application of various    customers.

4.What's the normal lead-time for the products?

  Normally, for the first order, the lead-time is around 50-60days while the lead-time will be shorten to 30-45days for the   following order.

5.Can you accept to mix several items in one lot or one container?

 Accept

6.What are the shipment terms you can accept?

FOB NINGBO

7. What are the payment terms you can accept?

We accept T/T, L/C, Alipay.



0.0782 s.