Share on (62222818008):
Main features:
The modular design automatically detects the laser power signal and automatically detects the water protection! The mounting holes are all the same and are suitable for factory assembly.
1.Adopting zero current half-bridge soft switch circuit, the power supply is featured by high efficiency and rapid response, and easy to match laser tubes of manufacturers.
2.It has simple port control, fits high and low level signals, can control laser start and stop through TTL level, and is equipped with abnormal protection switch to detect if there is water or ventilation outside.
3.Laser power can be regulated by inputting 0-5V simulation signal or inputting PWM signal.
4.The power supply has open circuit protection function: Under the condition of good earthing protection, the power supply can work in open circuit in short time, and then it can avoid the damage caused by laser tube cracking.
5.Ex-factory aging test: Each power supply can undergo a 12h aging test at high temperature of 60ºC on full load, and 500 times of 7sec power-on/off tests.
Main Technical Data:
AC input voltage | AC 110V | |
AC input frequency | 47~440Hz | |
voltage output | 45KV | |
Maximum current | 30mA(according to laser tubes of different manufacturers) | |
Efficiency | 91% | |
Overcurrent protection | 130% of maximum current | |
Open circuit protection | Yes (short time) | |
Structure | Fan cooling | |
High level control voltage range | ≥3V | |
Low level control voltage range | ≤0.8V | |
Operating temperature | -30℃~+65℃ | |
Relative humidity | 20~85%RH(noncondensing) | |
Withstand voltage | Input—output | AC1500V1 min ≤10mA |
Input—shell | AC1500V1 min ≤10mA | |
Output—shell | Connection | |
Insulation resistance | ≥50MΩ(DC500V) | |
Earth leakage current | ≤1mA(AC220V)≤0.5 mA(AC110V) | |
Vibration resistance | Amplitude 0.5mm frequency 10~55Hz three-dimensional direction 2h | |
Fault-free time MTBF | ≥30,000hours | |
60ºC high temperature test time on full load | 12 hours | |
7s power on/off test | 500 | |
Producrt show




We accept bank transfer TT (Telegraphic Transfer),western union paypal etc.
Payment must be made within 48hours of the auction end time
Shipment
1. we will send the goods within 3 working days once confirm your payment
2. the shipping cost does not include any import tax , and buyers are responsible for customs duties .
3.we ship mostly of the smaller order by China post Air mail (Package within 2 kg), it usually takes about 15-45 business days to arrive. The fast shipping way : if you need goods urgently , please select the faster shipping way , we can send by DHL , FEDEX , UPS , EMS and so on ,
4. If you have not received your shipment , please contact us , we will track the shipment and get back to your as soon as possible , Our goal is customer’s satisfaction ,
5. All packages by DHL fedex to brazil need to give CNPJ /CPF . All the package to Russia need the full name(first name +middle name +last name )
Feedback
Your satisfaction and positive feedback is very important to us ,please leave positive feedback and 5 star , if you are satisfied with our items and service .
If you have any problem with our items or service please be free to contact us first before you leave negative feedback ,we will do our best to solve any problem and provide you with the best customer service
Contact us
Welcome worldwide customer inquire and question ,we will try to do our best to feedback customers by email within 1 business days.

New products from manufacturers at wholesale prices