Share on (62239887017):

MAIN PARTS
OVERVIEW OF Kayak BLOW MOLDING MACHINE

6.Technical Specification of Kayak 2 Layers blow molding machine.
No | Specifications | KAYAK | |
Model No. | 2 layers | ||
| Processing material | HDPE/HMWHDPE | |
1 | Extruders | Screw Diameter (Internal layer | 110mm Barrier barrel |
Screw Diameter (Outer Layer) | 110mm Barrier barrel | ||
Plasticizing Capacity | 500kg/h | ||
L/D | L/D32:1 | ||
Gear Box Type | Hard surface | ||
Extruder Drive Motor (outer) | 90kw | ||
Extruder Drive Motor (Inner) | 90kw | ||
Heating Load | 80KW | ||
Max Screw Speed | 50RPM | ||
2 | Accumulator Die Head | Accumulator capacity | 80kgs |
Heating Load | 100KW | ||
Die-Core size | 450mm & 710mm | ||
3 | Moulding Clamping Unit | Max opening between Clamping Plate | 3500mm |
Min opening between Clamping plate | 1000mm | ||
CLAMPING PLATEN Size | 1800x4200mm | ||
Mould Clamping Force | 2200KN | ||
4 | Take out arm |
| |
5 | Hopper Loader | Loader | 1500kg 1pc |
Hopper | 50kg 2pcs | ||
6 | Delivery period | 5 months | |
7 | Size of Machine | [L xW xH ] (M) | 14*8.5*12m |
Training
1. The Buyer could send their operators to the Seller’s factory for training, including machine operation, maintenance & simple repairs.
2. Against the requests of the Buyer, the Seller’s technician could train the Buyer’s operators in the Buyer’s factory in the periods of installing & adjusting.
3. The training is free of charge.
Guarantees
1. The guarantee time is one year after the machines normally works at the Buyer’s factory.
2. After the Guarantee period is over, the seller should still provide services to the buyer in case need arises. The buyer affords the hotel,food and air ticket.
Inspection
1. Seller should issue or apply workable invitation letter so that buyer can apply China visa.
2. Seller should inform of the exact inspection dates so that buyer can make arrangements in advance.
3. Seller should do proper preparation of inspection so that buyer can make the inspection at once, when the buyer reaches seller’s factory
4. If buyer has some special inspection program, they should inform the seller in advance so that the seller can arrange it in advance.
5. Buyer can make both in-line and final inspection. If buyer does not want to do the in-line inspection, then seller should inform the buyer about the progress in the machine with appropriate pictures and videos
6. The seller is required to inform the buyer about the status of the machinery on a monthly basis.
7. Seller affords all the expenses of the inspection, which includes plastic material, power, workers and other needed facilities to the satisfaction of the buyer
8. Final inspection should last enough time in order to test every parameter requested by the buyer.
9. The buyer will test all different molds on the machines to check the quality of all products.



Installation & Adjustment
1. The Seller should send an engineer & his team to install and adjust the machines in the Buyer’s factory.
2. Machine assembly should be instructed by seller’s engineer, buyer can not assemble machine before sellers engineer reaches the factory
3. Buyer should inform seller the exact date on which the products are all unloaded to their factory, so that buyer can arrange the trip for installation to buyers factory.
4. Seller engineer is free of charge for 7-10 days till full installation for machines and successful commercial production.
5. Buyer should provide accommodation & food expense for engineer once sellerr’s engineer arrices buyer’s factory for installation & Adjustment.
6. The seller bears the cost of engineer’s air ticket for the first installatation & adjustment..







New products from manufacturers at wholesale prices