Share on (62266839003):
name :ABS/PVC water bibcock faucet tap
2) Size: 1/2"
3)thread:NPT,BSPT
4)new material ,high quality
5)Certification: CE,ISO9001
product name : ABS /PVC bibcock faucet
1) Material: ABS,PVC
2) Size: 1/2", 3/4"
3) We supply many products for choice
4) Packing: Polybag, color box
5) OEM service offered
6) nozzle ones and non-nozzled ones are both available
| Model NO. | SJSX-029 |
| Brand | SJSX |
| Material | PP/ABS |
| Type | Water Dispenser Parts |
| Application | Water Dispenser,Beer Barrel,Beverage Barrel/Water dispenser |
| Certificate | ISO certificate LFGB certificate |
| ODM and OEM | To order |
| Port | Ningbo & Shanghai Port |
| Payment Term | T/T, L/C, Western Union, PayPal, Bank |



1.Q:Before mass order,can we have some samples?
A:Of course,clear samples are free,but the Express fee would be paid in advance if you don't have an express account
2.Q:How long it take you to make our colored samples?
A:In a week,and the samples fee is 60usd
3.Q:Can we visit your factory?And how can we contact you?
A:We welcome you,we can pick you up and make arrangements for you.


1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.
You can use your own express account or prepay us if you do not have an account.
4) How long does the whole procedure being worked out?
After you place a order, the production handling time is about 15-45 days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are. It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense
Trade Show

New products from manufacturers at wholesale prices