(3)Pre-drying The first side: 75℃±5℃×10~15 minutes The second side: 75℃±5℃×15~20 minutes. Both sides: 75℃±5℃×20~25 minutes.
(4) Exposure Exposure energy: 100~180 mj/C㎡, be subject to: 7-9 steps of residual film out of 21-step sensitivity guide.
(5) Developing Composition of developing solution: 1% of Na2CO3 solution; Temperature of developing solution: 30±2℃ Developing time: 40-60 seconds; Developing spraying pressure: 1.8-2.2kg/c㎡; Washing pressure after developing: 1.8-2.2kg/c㎡; Washing time after developing: 20-30 seconds.
Matters need attention: 1. To fully stir till it’s well-proportioned before using it. 2. Parameters above is only for reference, the specific operation should be subject to samples.