Share on (62278123330):
Bitumen-based rubber Liquid Membranes for pool waterproof seepage control

Product Description:
Polymer modified bitumen waterproof coating is a kind of water-based waterproof coating using SBS,APP,etc.high polymer modified bitumen then produced through a special craft. It has excellent construction performance and usage performance, with elastic plasticity, low temperature flexibility and aging resistance.
Product Specifications
Material | Modified Bitumen |
Thickness | 1.0mm-3.0mm |
Application Density | 1.5-2Kg/sqm while thickness is 1.5mm 2.5-3Kg/sqm while thickness is 2mm |
Application Method | Brush |
Packing | Iron Barrel, Pallet |
Colors | black |
Technical data
No | Item | National StandardⅠ | National Standard Ⅱ | ||||
1 | Solid Content %≥ | 48 | |||||
2 | Dry Time h≤ | Dry time of Outside | 12 | ||||
Dry time of Inside | 24 | ||||||
3 | Crack Resistance Mpa ≥ | 0.3 | 0.2 | ||||
4 | Breaking elongation,(normal temperature) %≥ | 400 | 300 | ||||
5 | Water impermeability, 0.3Mpa 30 min | Impermeable | |||||
6 | bending at low temperature℃ ≤ | -25 | -20 | ||||
7 | Bonding strength of Moist base Mpa ≥ | 0.2 | |||||

Features:
1. Never curing, content of curing material more than 99%, almost no volatile. Always keep gel-like after construction.
2. Excellent resistance to corrosion, high and low temperature; Non-toxic, no odor, no pollution, flame-retardant.
3. Strong adhesion to any kind of substrate, can be applied on wet substrate.
4. Good flexibility, high elongation, well adapted to substrate deformation.
5. Strong self sealing. The non-curable rubber modified bitumen waterproof coating will flow to the damaged place and fill full in it.
6. Simple application by airless spray, scraper. It's both ok to construction at normal temperature and sub-zero.
7. Compatible with other waterproof materials together to improve the waterproof effect.
8. Form the stable, seamless and complete waterproof layer.
Application:
1. all kinds of prefabricated, cast-in-place concrete structure of the workshop, warehouse, civil construction and other roofing and joint waterproofing;
2. the ground floor of the permanent residents of the wet and kitchen, the balcony of long-term waterproofing;
3. basement wall, basement and pool waterproof seepage control;
4. maintenance of the old asphalt felt roof gutter, asbestos tile roof and various structures, such as flashing Water Leakage;
5. corrosion of pipeline components, can also be painted on the surface of the self waterproof rigid structure, anti seepage and prevent the component from the role of corrosion
Construction Requirement
1. Base-treatment: it is required to be firm, leveled, clean, and dry.
2. Partial treatment: internal and external corners should be shaped arch, the joints between pipes, walls and plates should be filled with this product. If necessary, non-woven fabric or fiberglass mesh fabric should be added to these joints. After this, coating-application of large-area can be carried out.
3. Application of coating: coat the base several times (2-3times suggested); the direction coating of different times should be perpendicular. Another time of coating should be not carried out until the previous coating is too dry to stick to hands.
4. Vertical-face Treatment of walls: after painting the last time of coating, sand should be scattered before it is solidified.
5. Construction of external layer: after the coating is solidified completely (about 48 hours), conduct the construction of external layer.
6. Suggested Quantity: Film Thickness: 1.5MM, Coating Dosage:1.5-2kg/sqm.
Packing and Loading
Particle size | |
Powder size | No. 60 mesh |
Granular size | No. 20 mesh |
Packing | |
Iron Barrel | N/W: 20kg /barrel |
Contact Us:
Demi Yao
Wechat/Whatsapp/Mobile:+86 157 3325 8474
www.sanyibuilding.cn ; www.tilebacker.cn
//sunway-china.en.alibaba.com
//facebook.com/backerboard
https://twitter.com/tilebackerboard
We do OEM as well. Welcome to make an enquiry and we will give you quick response in 12 hours!
New products from manufacturers at wholesale prices