Share on (62282174950):
1. Basic Introduction
Protective casing, high-pressure acidification of the production layer, sand fracturing, pressure test and other operations.
The packer uses a hydraulically sealed upper tubular string to unseal the working mode. The hydraulic piston is pushed up to open the limit mechanism and compress the rubber cylinder to realize the setting, and the locking mechanism enters the locking state; the lifting pipe column, the central pipe of the packer and the outer layer are misaligned and unlocked. To achieve unblocking.
2. Technical Features
1) l can withstand a pressure difference of 10,000 psi (70 MPa);
2) Internal locking ring ensures stable seating force;
3) l anchoring and sealing integration;
4) lMultiple rubber cylinders ensure sealing stability after setting;
l Water, natural gas, oil and other standard environments.
4. Technical Parameters

5. Product rendering

Besides, we also provide other specification packer for your selection, please feel free to contact us directly or send a inquiry ;-)

Sichuan Weiwodun Chemical Industry CO,.Ltd was founded in 2006, which covers an area of 16000 square meters and located in Deyang, Sichuan. We have experienced technical stuff, professional factory and excellent sales team. And we passed ISO 9001, ISO 14001 and OHSAS 18001. With years of constant pursuit for product research and development, we keep updating our product and now already have more than 20 patent certificates.
Q : Are you manufacturer or trading company?
A : We are an integrated company of manufacturing and trading. Expert R&D department and sophisticated supply chain is our key to success.
Q: What if I never import this product before, what should I do?
A: Don’t worry. We have professional fulfillment department will help you with every process.
Q: What’s the min order?
A: Different product has different min order. Please feel free to contact us with for your requirement.
Q: How long is your delivery time?
A: According to the quantity, we will ship soon if we have it in stock, otherwise 1-2 months to finish the production and package,
Q: What’s your terms of payment?
A: 30% in advance and the other 70% paid when we finish production and ship to the Chinese port.
New products from manufacturers at wholesale prices