Low Cost High Quality Tunnel Commercial Used Aquaponic Single span Greenhouses

Share on (62282345444):


Price:RUB 303.28 - RUB 682.37

Quantity:


Product Overview

Description

Low Cost High Quality Tunnel Commercial Used Aquaponic Single-span Greenhouses
★The single-span tunnel greenhouse is specially designed for the small grower. It is welcomed by the customers for its low cost and high quality. This is the most popular style you can see everywhere. The tunnel polyethylene greenhouse can meet the requirement of some small grower.
★Extending the crop season
★Providing protection from wind, heat, hail, rain, bird, ash, pollution air etc
★More stable production systems
★Easy construction and installation
★Low investment,low running cost
The Relative Greenhouse Parameters
Greenhouse Style
Singlespan,Arch type
Span Width
8.0m/9.6m/10.8m (Customizable)
Length
50m-70m (Customizable)
Column Space
1m-5m (Customizable)
Height
3m-7m (Customizable)
Wind Load
0.5KN/m2
Snow Load
0.3KN/m2
Planting Hanging Load
0.15KN/m2
Rainfall
140mm3/h
Pipe line
Hot dip galvanized steel pipe with zinc coat 275g/square meter
Covering material
Single/Double PE/PO Film
Film Thickness
0.06mm/0.08mm/0.12mm/0.15mm/0.20mm
Transmittance Rate
>80%
Film Color
Transparent/White/Blue
Covering Material Service Time
>5 Years
The Optional Greenhouse Systems
NO.
ITEM
DETAIL
INCLUDED OR NOT
1
Wall
Clients can build or not
Built by clients
2
Steel structure
Hot dip galvanized steel pipe with zinc coat 275g/square meter
YES
3
Roof cover
0.12m/0.15mm/0.20mm PO/PE Film
According to clients' requirement
4
Outside shading system
Black shading net shading rate 75%
According to clients' requirement
5
Inside shading system
Aluminum foil mesh shading rate 65%
According to clients' requirement
6
Inside warm keeping system
Space quilt, 120 gr/m2
According to clients' requirement
7
Cooling system
Cooling pad and Cooling Fan
According to clients' requirement
8
Heating system
Boiler&Heating fan/Boiler&Heating pipe
According to clients' requirement
9
Ventilation System
Top/Side electric/manual rolling film machine
According to clients' requirement
10
Irrigation System
Drip irrigation/ Spray irrigation
According to clients' requirement
11
Lighting System
High - pressure sodium lamp, or LED lamp
According to clients' requirement
12
Hydroponic growing system
NFT/DWC Coconut coir planting system
According to clients' requirement
Soilless Cultural System
Planting fruit vegetables with coconut planting system
Planting leafy vegetables with hydroponic pipes planting system
Packing & Delivery
We make sure the strongest packing in our factory, the fastest delivery speed and the best quality of our greenhouse product. We can provide 12 months guarantee after the delivery.
Our Service
1.Reliable Design: New Trust Sun has numorous patent rights in greenhouse field and occupy the leading positon of the greenhouse.
2.Strong Technology Team: Professional R&D center guarantee top quality and advanced reliable design for each project.
3.Personal Customization: All the greenhouse design is made according to customers' local climate condition and requirements.
4.Good After-service: New Trust Sun could send engineer go abroad for correct installation, horticultural service and other service for you.
5.Quality Warranty: If any parts or structure has some probelm within warranty period,we will maintain or change free of charge.
Our Company
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 20-30 days after order.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: How to install the greenhouse? Do you provide installation service?
A:We will provide paper or video building manual, or if needed we will send engineer to do installation guidance.

Q: What preparations I should be before installation.
A:First finish the greenhouse building authorization from the government if required.
Second prepare the tools as per the tool list we send to you.
Third prepare the workers.
Forth prepare the po wer supply if needed.
Fifth prepare one place that can store the greenhouse materials after arrival to protect it from rain if needed.
Related Products

0.1994 s.