LNG natural gas filling station construction

Share on (62306325676):


Price:

Quantity:


Product Overview

Description


Intergrated LNG gas station prefabricated space frame steel structure petrol station constructionLNG natural gas filling station construction

555555_01.gif

 

 

Product display

Fixed filling station

.png

 

1.png

 

Skid-mounted filling station

LNG1.png

 

Classification and Configuration Table of LNG Gas Station

category

Application

Configuration details

 

 

 

 

Skid-mounted filling station, explosion-proof box filling station

 

It mainly integrates power system and pipeline system control system and metering system to facilitate various forms of station construction needs, to meet customer requirements to the utmost extent, shorten the time of operation, and facilitate the logistics, bus, port and terminal, urban city center LNG station construction needs .

model

AYJQ-0030

AYJQ-0060

 

 

Gas storage capacity (m³)

30m³

60m³

 

 

Daily gas filling capacity (Nm³/day)

15000

30000

 

 

Tank design pressure(MPa)

1.32

1.32

 

 

Pipeline design pressure(MPa)

2.0

2.0

 

 

Number of filling pumps (set)

1

1-2

 

 

Number of dispensers(set)

1

1-4

 

 

Coverage of equipment(m²)

300

300

 

 

Equipment power (KW)

20

20-40

 

 

 

 

 

Fixed filling station

 

 

 

It is mainly used for building stations with large traffic flow and great potential in the later market.

model

AYJQ-0060

AYJQ-0120

 

 

Gas storage capacity (m³)

60m³

120m³

 

 

Gas filling capacity (Nm³/day)

30000

60000

 

 

Tank design pressure(MPa)

1.32

1.32

 

 

Pipeline design pressure(MPa)

2.0

2.0

 

 

Number of filling pumps (set)

1-2

2-4

 

 

Number of dispensers(set)

2

2-4

 

 

Coverage of equipment(m²)

1000

2000

 

 

Equipment power (KW)

20-40

20-80

 

 

Product advantages:

1. More safety: When there is abnormal pressure rise or pipeline leakage during filling and unloading, the system automatically closes the relevant pipeline valve, and can automatically cut off power in case of emergency.
2. More economical: less floor space, easy to move and transfer. 3. More intelligent: The PLC control system will monitor and control the equipment pressure, temperature and flow in real time, and automatically judge and repair all abnormal conditions to reduce the workload of the operators.
4. More reliable: After the on-site installation of the gas filling equipment, the operation failure rate is greatly reduced, and the construction quality and cold preservation effect of the LNG process pipeline are further improved.

FAQ

(4)_04.gif

If you have questions about AUYAN® products, here's where you can find the answers. If you don't find the answer to your question here, feel free to contact us by telephone, email.

 

Q:What is the warranty of your Products?
A:The warranty for the vacuum of equipment is 3 years from the date of sale.
All components come with a limited 1 year manufacturer warranty on defects in material or workmanship from the date of purchase to the original owner.

Q:What trade terms can you apply in the contract?
A:EXW, FOB and CIF are the regular terms we use.

Q:What are some methods of payment?
A:T/T, L/C, as well as Paypal are supported.

Hot Products

 1_02.gif

Application scenario

 

5.gif

About us

 555555_05.gif

8.gif

Production Process

 7.gif

Certification

 

555555_07.gif

Contact Us

click for more information


0.1848 s.