Share on (62307936694):
Soap reactor iron man arc reactor reaction vessel

Product pictures show



Product Details

Application
It is the main reaction equipment in the chemical production and is also widely used in chemical production such as resin, adhesives, paint coating, cosmetics, pharmaceutical and other chemical products.
| ![]() |
Performance and Advantages
![]() | 1.Rapid heating 2.Corrosion resistance 3.High temperature resistance 4.Non environmental pollution 5.Automatic heating without boiler and simple & convenient operation |
1.Electrical heating reaction still
2.Steam heating reaction still
3.heat transfer oil reaction still
Laizhou New Hongda Chemical Machinery CO., LTD was founded in 1996. It’s a first chemical machinery private enterprises in Shandong Province.
We are specialized in manufacturing many kinds of chemical machinery for petroleum, chemical industry, coating, paint, pharmacy and so on.
All products have past the test of CE certificate. In addition, we also could manufacture the machine according to customers’ special needs.
We will continuously improve the product technology and grade, and focus on the customer demand as the starting point.



Packaging Information:
Standard export plywood case for equipment, or as per customer's requirement.
Delivery Information:
About delivery approach
A: By sea or by air, detailed delivery approach could be discussed.
About delivery time
Usually it takes about 15-30 working days after we receive your PO and prepayment. However,
it would depend on our production schedule and the complexity of the equipment.
About trade term
A: Usually we send the equipment in FOB term, however, the CIF is also acceptable, which
could be decided by customers,
Payment Information:
By T/T in Advance, or Irrevocable L/C at Sight. The trade will be guaranteed by Alibaba
1.How about your advantages?
a. On time delivery.
b. More than 20 years’ experience.
c. Quality guaranteed and professional service.
d. Various design based on client’s requirements.
2. How to place order?
Send inquiry→Basic quotation→Confirm details→ PI & Contact→Pay deposit→Production ( 20-30 days)→Pay balance→Delivery (5-8 days by air, 28-35 days by sea.) →After-sale
service.
3. Will you send us drawing of required machine for checking?
Yes, we’d like to send you our draft drawing of the required machine . After you place
order, we shall send you details drawing and technical parameters. Then shall put into
production once you confirm the production.
4. Is there any quality warranty and after service?
The warranty period of mechanical portion of the equipment shall be a year after you
received the equipment, and help buyer installation and commissioning the equipment,
and free training operator.


New products from manufacturers at wholesale prices