JIS3303 secondary tinplate sheets 73mm tinplate cans easy open end

Share on (62316578965):


Price:$620.00 - $670.00

Quantity:


Product Overview

Description


Production Description

Tinplate Sheet  

 

NameSPTE OR ETP
StandardJIS3303/ EN 10202 - 2001/ ASTM A623 M - ASTM A 626M - 95/ GB T2520-2008/ ISO11949-1995/ ISO11950-95/ ISO11951-95
Hardness(HR30T)T2.5, T3, T4, T5
MaterialSPCC, MR
Coil ID500-510MM
SurfaceBright, Matte
Thickness0.14-0.5MM
Width600-1100mm
AnnealingBA, CA
Difference Thickness1.1/2.0,  2.0/2.8,2.8/5.6  5.6/8.4  8.4/11.2
Equal Thickness1.1/1.1(10#), 2.8/2.8(25#), 5.6/5.6(50#),   8.4/8.4(75#)  11.2/11.2(100#)(10#)
Packaging DetailPlastic film, anti - rust paper, iron sheet packaging
Wooden splints fixation

 

 

Production Line 

 

 photobankQQ20190906135649_20191010150125_20191010150130

 

 

 

 Package And Loading

 

3 (2)

QQ20151012095218

 

 

Common Usage

 

CANSUsage

 

 

Our Advantages

OUR ADVANTAGES

paste-pic-dp_uuid_251xy

Quality assurance

 

 

Our company has excellent reputation all over the world, we provide the best pre-sales and after-sales service for the majority of customers.

Our service

Customer first, do the best product.we sincerely hope to establish good relations of cooperation , work together for green trade.

Independent factory

 

 

We have own fary and warehouse area of 10,000 square meters

Professional team

 

 

Our team is very eoxperienced in the steel industry,and we cooperate with Baosteel,Tewoo,Ansteel,and so on,some big goverment steel factory.

FAQ

FAQ

1. How to buy your ideal products?

You can provide us your drawing, and we will produce as your drawing.

 Or we can design as your requirements if you do not have a clear plan.

2. How to pay?

TT and L/C are acceptable and TT will be more appreciated.

3. What is the delivery time? 

It depends on order quantity.Generally, the delivery time will be within 10 to 15 days.

4. What is steel quality?

We cooperate with Baosteel, Tewoo, Ansteel,and so on,some big goverment steel factory.

5. How to order from TF ?

Buyer Send Enquiry →Get TF Quotation → Order Confirmation

 → Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit

 → Strict Inspection during Production → Buyer Arrange Balance Payment

 → Packing → Delivery as per Trade Terms (FOB/CFR/CIF)

Contact Us
paste-pic-dp_uuid_wddqq
paste-pic-dp_uuid_nox6f

0.1993 s.