LDPE film squeezer screw press dryer / PP woven bag squeezing machine for waste plastic wet

Share on (62349420405):


Price:$10,000.00

Quantity:


Product Overview

Description



Product Description


washing line Floating Washer20160112_163753.jpg20160112_163823.jpgIMG_0104.jpegIMG_0106.jpegIMG_0107.jpeg



Product Detail































































KeywordsPet bottle recycling line
NameCustomizable pet bottle recycling line
Raw materialPET PP PE PVC
StatusBrand new
FunctionHigh capacity
ManufacturerREDSTAR
Final productDry Plastic Flakes
Capacity1000-5000kg/h
ControlFull-automatic
ColorBule


Pet plastic scrap washing drying line is used for crushing,washing and drying the used PET bottle flakes.


This line is consist of the following machines: debaler, trammer, label remover, manual sorting table, mental detector, crusher, hot washer, floating tank, drier, label blower, hopper and electric cabinet.


Usage: Remove labels, caps and so on.


Screw motor power: 4KW


Thumb-wheel motor power: 2.2KW


Number of thumb-wheel: 4


Rotating diameter: Φ350mm


Width: 1800mm


Length: 9200mm


The parts which cintact with water is made of SUS304







Packaging & Shipping



Vibrator




Company Information



Vibrator






Our Advantages



Vibrator






Exhibition



Vibrator






Workshop



Vibrator






Packaging & Shipping



Vibrator






FAQ





1) What's your guarantee or the warranty of the quality if we buy your machines?


We offer you high quality machines with 1 year guarantee and supply life-long technical support. 




2) When can we get my machine after we paid?


Normally production time is around 30-45days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.




3) How to install my machines when it arrives?how much the cost?


We will send our engineers to your factory to install the machines and train your staff how to operate the machines.


Customer pay air tickets go and back,accommodation and USD80/day/person.




4) How long time for installation?


According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.




5) How about the spare parts?


We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.









0.1981 s.