Share on (62362264818):





| Automatic Grade | Automatic |
| Voltage | 380V 50HZ |
| Mesh Clean | Auto by Water |
| Mesh Dia | 2mm |
| Plastic Type | PP PE PET HDPE LDPE |
| Final product | Clean Flakes |
| Shaft length | 2m |
| Rotor speed | 1500RPM |
| Electric control | Optional |
| Screw loader | Optional |
Product Description:
Plastic bottle recycling centrifugal dryer machine
Frication Washer machine with high speed, high capacity, better washing effective used for the PET Recycling, PE/PP Recycling
This machine is same as the Europe design and improved after use experience. Its mainly used for the plastic granules, Plastic Flakes, especially for the PET flakes, HDPE, PP rigid flakes dewatering, spin drying.
Compare to the normal vertical dewatering machine, it can be more effeciency and more effective. Can do better dewatering effective. for example the PET flakes after dewatering the moisture is < 1%. So can directly use without the other drying.
This plastic dewater machine is is a perfect machine to dewatering for hard plastic, such as plastic PET/PVC/HDPE/LDPE/PP bottle flakes, sheets, pellets and so on. Washing the material and with high speed to remove the drain out of the water, the material Moisture <2%.
1- high speed frication wasking more cleaning.
2- feeding part with screw design no material poping out.
3- rotor, paddles, mesh all made by SS.
4- with water spraying system to cleaning the mesh automatic.
5- special designed bearing house with water cooling system to protect the bearing.
Other parameters:
Mesh Material:SS
Production Capacity:300-2000kg/h
Warranty:12 Months
After-sales Service Provided:Engineers available to service machinery overseas
Power(W):22kw
Weight: 1000kg






We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Normally production time is around 30-45days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
We will send our engineers to your factory to install the machines and train your staff how to operate the machines.
Customer pay air tickets go and back,accommodation and USD80/day/person.
According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
New products from manufacturers at wholesale prices