Automatic power disinfection thermal fogger machine orchard chemical insecticide sprayer for agricultural mosquito killing

Share on (62375769816):


Price:$230.00 - $240.00

Quantity:


Product Overview

Description





Product Description


Automatic power disinfection thermal fogger machine orchard chemical insecticide sprayer for agricultural mosquito killing




Name
Sprayer machine
Size
1200*260*310mm
Weight
8kgs
Spray efficiency
100-130L/hour
Two type
Single valve and Doble valve
Start way
Electric quick start & Manual trachea start
Water and drug box capacity
18L
Oil box capacity
2L





    Application of sprayer

The fogging machine / mist sprayer can be widely used for crops, economic trees, cotton, greenhouse crops, spraying pesticides, as well as warehouses, docks, military camp, city sewer, farms, passenger cars, residential areas, urban sanitation disinfection, insecticide, sterilization.




Detailed Images




1. copper valve, durable, long service life


2. Compound double carburetor, fast reaction, more stable and durable



3. Stainless steel protective shell: anti collision, beautiful and durable

4. Thick explosion tube, durable and high temperature resistant







Packing&Shipping


Great quality carton box




Company Introduction




FAQ



1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are
manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for
manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-45days.It also denpends on which coutry and port you are. If there
are some emergencies we can send the goods via air express, as long as you afford the traffic expense.


Contact Us




0.1842 s.