China factory supply directly Granulated wood lignin fiber

Share on (62377659067):


Price:RUB 105.48

Quantity:


Product Overview

Description


Cellulose fiber for asphalt SMA is called GSMA.It is a high quality and high purity granular fiber made by physical extrusion of pure flocculated fiber.It is widely used in SAM pavement, which can improve the anti-aging ability and durability of asphalt layer, thus greatly extending the service life of pavement.
Cellulose fiber for asphalt SMA can form a three-dimensional network in asphalt, which plays the role of reinforcing, and at the same time obstructs the flow of asphalt, making the asphalt membrane in a relatively stable state. Even when the temperature expansion, it can guarantee the asphalt does not flood oil.Moreover, the fiber adsorption is strong, which can fully absorb the bitumen inside the mixture and tightly adsorb the bitumen on the surface. As a result, the amount of bitumen is increased, the bitumen film becomes thicker, thus improving the anti-aging ability of the bitumen layer and greatly extending its service life.At the same time, the particle fibers also have the characteristics of easy dispersion. The pre-mixing in 5-15 seconds can guarantee its uniform distribution, and this characteristic can also avoid the generation of micelle in the mixture.
Company Profile
Changzhou Leade New Material Technology Co., Ltd. was established in 2002,is a set science, industry and trade integration technolog enterprise.
In the new construction materials field, with the good relationships of relevant tertiary institutions, scientific research units,
focus on two areas of functional fibers and materials which cement and asphalt base application development. Our company continuous develops PP Monofliament Fiber、PP Mesh Fiber、Bundle hinge Fiber、Steel fiber、Polyacrylonitrile fiber、Polyester fiber、Wood fiber、Cellulose fibers、Mineral fiber 、Anti-rutting agent、Asphalt additives /modifier...

Recommend Products
Customer Photos
HUNAN FOURTH ENGINEERING CO.

SOUTH CHINA NORTH WATER TRAN

YONG ZHEJIANG HIGHWAY ENGINE

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:

0.2168 s.