Share on (62384253771):
♥High class quality and very perdurable/undestroyable.
♥Its fashionable design is perfect to decorate your motorcycle.
♥IPlug-and-play, direct fit, easy installation.
♥Fitment:For Suzuki GSF600 GSF1200 Bandit 1995-2005.
Speclfication | ||
Name | Motorcycle Ignition Switch Assembly | |
Material | Aluminum +Plastic | |
Number of Keys | 2 | |
Quantity | A class | |
Size | Standard size | |
OEM | Acceptable | |
Application | Lock Set | |
Fit | Suzuki GSF600 GSF1200 | |


The mechanics of a motorcycle ignition system depend upon its type and age. Motorbikes built before the late 1970s usually feature mechanically-controlled cam-driven points, whereas post-1970s bikes almost always contain pulsar coils instead.
Pre-1970 motorcycles commonly contain mechanical advance ignition systems, which work via cam-driven points. When the points are closed, electricity flows into and charges the ignition coil. When the points are open, the charge in the ignition coil flows out rapidly, sending a large amount of current to the spark plug, thus causing the engine to start.
The concept of a point-centric ignition system is very simple and has been around almost as long as the motor vehicle. However, the points do need to be replaced periodically, as they get worn out over time. Timing is handled via a mechanical advance system, which controls when the points open to produce the correct charge.
Post-1970 motorbikes usually use a capacitor discharge, or thyristor ignition system. Instead of a set of points, the CDI ignition uses electrical current from the motorcycle's battery or stator to charge a capacitor unit. The charge in the capacitor unit is then sent through the coil, where it creates the spark necessary to start the bike's engine.
Timing in CDI ignition systems is controlled by a combination of a pulsar coil component and a flywheel, which operates in tandem to ensure that the correct charge emerges from the capacitor unit at the correct time.








Taizhou Xinydd Machinery Co., Ltd. was founded in 2015. We located in Binhai Industrial Area, Taizhou, Zhejiang Province. We have professional engineers and management team in the producing of the clutches for U.S.A, Russian, Europe, Brazil, and other countries. We have enough ability to satisfy different requirements from yours in this field.Who could bring a lot of international experience and professional and an unparalleled level of service for you.
Q1. How to pay?
A: TT, PAYPAL, WEST UNION, DP, DA, Credit card up to you.
Q2. What is your term of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q3. How about your delivery time?
A: Generally, it will take 24-48 hours after receiving your advance payment. Some is one week. The specific delivery time depends on the items and the quantity of your order.
Q4. How to produce customized products?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q5. How to get a sample?
A: We can supply the sample if we have ready parts in stock.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q7: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
New products from manufacturers at wholesale prices