Share on (62391916920):
ITEM | JSL-001 |
Appearance | Grey |
Uniform Sticky Liquid | 1.35±0.05 |
Density (g/cm³) | 1.35±0.1 |
Tack Free Time (Hr) | 2.5 |
Adhesion Elongation | 666 |
Hardness (Shore A) | 20 |
Resilience Rate (%) | 118 |
Curing Speed (mm/24h) | 3 ~ 5 |
Elongation at Break (%) | ≥1000 |
Solid Content (%) | 99.5 |
Operation Temperature ( ℃) | 5-35 ℃ |
----frieda(at)joy-free.com 0086-13774424414

---No bubbles
---Excellent UV resistance for 10+ years
---One component Self-leveling, excellent flowability, easy to scratch sewing operation
---Free solvent, non-toxic odorless after curing, environment-friendly
---High displacement, no crack, fall off, suitable for sealing kinds of concrete road
---800+ Elongation, Super-bonding without Crack Excellent water resistant, oil resistant, acid and alkali resistant, resistance to puncture
----frieda(at)joy-free.com 0086-13774424414

Bonding and sealing for the gap of joints of road, airport runway, square, wall pipe, wharf, roof,
underground garage and basement
Sealing for leakage of oil refinery and chemical plant

Cleaning: The substrate surface must be solid, dry and be clean. Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning, blowing, and so on.
Operation: Put the sealant into the operating tool, then injecting it into the gap.
Reservation Gap: The construction joint will expand as the temperature change,so the surface of the sealant should be lower than 2mm of the pavement after construction.
----frieda(at)joy-free.com 0086-13774424414

Gross weight: 21.3kg
0.048 cbm/Drum
20ft Container: 560drum 11.2 tons

below 2000kgs 7-15days
5000-20000kgs 15-25days
OEM: 30-50days of first order
Shipping way
Samples: DHL, Fedex, TNT etc.
Cargo: By sea, by air, by railway etc.
----frieda(at)joy-free.com 0086-13774424414








New products from manufacturers at wholesale prices