Best selling Nickel base Alloy mig Welding Wire for Industrial welding

Share on (62392108848):


Price:RUB 1,440.55 - RUB 2,994.82

Quantity:


Product Overview

Description

_02

Product Description

 

ERNiCr-3 has a nominal composition (wt.-%) of 72 Ni, 20 Cr, 3 Mn, 2.5 Nb + Ta. Filler metal of this classification is used for welding nickel-chromium-iron alloys (ASTM B 163, B 166, B 167, and B 168 having UNS Number N06600) to itself and for the clad side of joints in steel clad with nickel-chromium-iron alloy. It can also be used for surfacing steel with nickelchromium-iron weld metal, for dissimilar welding of nickel-base alloys, and for joining steel to stainless steel or nickel-base alloys using GTAW, GMAW, SAW, and PAW processes. ERNiCr-3 provides high strength and good corrosion resistance, resists oxidation, and delivers creep-rupture strength at elevated temperatures. It is ideal for welding in desalination plants because it is formulated to resist pitting corrosion and stress-corrosion cracking in chloride containing environments. ERNiCr-3 is also well suited for welding in a variety of temperatures – from cryogenic to elevated – in such applications as piping, furnace equipment, and petrochemical and power generation plants.

 

Standard:AWS A5.14 EN18274 ,ASME II, SFA-5.14, ERNiCr-3
Size:0.8MM / 1.0MM / 1.2MM / 1.6MM / 2.4MM / 3.2MM
Form:MIG(15kg/spool), TIG(5kg/box)
Usage:used for welding the INCONEL ALLOY 600/825/25-6MO, and other stainless steel with Mo by the way of gas metal arc welding, tungstun-inert-gas arc welding.
Weling series: ERNiCrMo-3,ERNiCrMo-4,ERNiCrMo-13,ERNiCrFe-3,ERNiCrFe-7,ERNiCr-3,ERNiCr-7,ERNiCu-7,ERNi-1

 

Detail Images

2003

 

Other product series :

FeCrAl Alloy: OCr15Al5,1Cr13Al4, 0Cr21Al4, 0Cr21Al6, 0Cr25Al5, 0Cr21Al6Nb,0Cr27Al7Mo2.Go to Review

NiCr Alloy: Cr20Ni80,Cr30Ni70,Cr20Ni35,Cr20Ni30,Cr15Ni60.Go to Review

CuNi Alloy: NC003,NC010,NC012,NC015,NC020,NC025,NC030,NC040,NC050,Constantan,6J8/11/12/13/.Go to Review

Welding wire: ERNiCrMo-3/4/13,ERNiCrFe-3/7,ERNiCr-3/7,ERNiCu-7,ERNi-1, ER70S-6.Go to Review

Thermocouple alloy: K,J,E,T,N, S,R,B,KX,JX,EX,TX,NX.Go to Review

Inconel alloy: Inconel 600,601,617,X-750,625,690,718,825.Go to Review

Incoloy alloy: Incoloy 800,800H,800HT,825,925.Go to Review

Hastelloy alloy: HC-276,C-22,C-4,HB,B/2/3,X,N.Go to Review

Monel Alloy: Monel 400,K500.Go to Review

High-temperature alloy : A-286,Nimonic80A/90,GH131,GH1140,GH36,GH2706,GH2901,GH3625,GH3536,GH4169.Go to Review

Precision alloy series: 1J33,3J01,3J9,4J29,4J32.4J33,Invar36,4J45.FeNi50.Go to Review

Thermal spray alloy: Inconel 625,Ni95Al5,Monel400,45CT,HC-276,K500,Cr20Ni80.Go to Review

related products

 Our Service                                                                                  
Customized service.jpg
Produce Process                                                                             
product progress.jpg
Application                                                                                      
_19
Packing & Delivery                                                                          
_49
_46
Our Company & Team                                                                    
_42_44_45
 
FAQ                                                                                                 

How can I contact with your company?

We are always ready to serve you via Email, Telephone, Fax, Skype, Whatsapp or Mobile phone.

Phone:+86-18018210953

Whatsapp/Skype/Wechat:+8618018210953

 

 

What is your working time?

Monday-Saturday : 7:30AM-17:00PM (Beijing time, GMT+08.00)

We have public holiday during May.1-3, Oct.1-7 and Chinese New Year holiday . For detail,

please see our update holiday notice. During these period, if you have a demand, Please

send me an email.

 

Do you provide free samples?

Yes, we can provide a free sample for testing,buyer should bear all the shipping costs.

 

What is your payment terms?

T/T,L/C,D/A,D/P,Western Union,MoneyGram,Paypal

 

What is the lead time?

Usually sample lead time is 7 days after payment has been confirmed.

Normal order is 10-20 days,it depends on customers' quantity.

 

0.081 s.