Share on (62397065323):
Factory Model:LT-9
| |||
| Voltage (V) | 220-240V~ | Alarm for lack of water and shut off function | N |
| Power (W) | 2200W | Function | Ironing garment,trousers,curtain, get rid of sheet's mite bug , doll disinfection |
| Steam generated time(s) | 50's | Protection system | Y |
| Steam flow(g/min) | 45g | Accessories | Brush,pants clips,fold hanger, stainless steel pole |
| Working time | 66minutes | Sample leadtime | One week |
| Water capacity(L) | 3L | Loading quantity(20'/40'/40HQ) | 20':510pcs / 40': 1050pcs / 40HQ:1245pcs |
| Cable length(M) | 2.2M | Price valid | one month |
| Hose length(M) | 1.70M | Aprroval certificate | CE,CB,Rohs |
| pole material | Stainless steel | Package | 1pc/GB ,3pcs/1CTNS |
| Pole adjustable length(M) | 1.75M | CB size(mm) | 410*270*440 |
| Boiler material | Titanium Aluminum alloy/Copper | MC size(mm) | 830*430*465 |
| Ironing head material | PA6+PA66+Aluminum | MC Volumn(CBM) | 0.166 |
| Removeble water tank(Y/N) | Y | MC G.W.(kgs) | 24 |
| Steam control | Two power level, switch control panel | MC N.W.(Kgs) | 20 |

A. Fwo power level.
B. Stand holder for steam nozzle
C. Telescopic pole for compact storage
D. Temperature up to 98℃ which can kill garments’ 99.99% germ.
E. Professional design boiler takes high efficiency and low consumption
F. Roll caster for easy movement
G. Big capacity removable water tank for easy operation
color: 1. Silver , 2. Red Pearl ,3. Goden


OUR FACTORY
The company has an integrated production system including plastic injectionn, boiler design and production

WE has strong R&D team has become the leader manufacturer in garment steamer areas after more than 15 years 'development.
CERTIFICATE


As a leader professional manufacturer of garment steamer, Yiting is always ready to provide first class products and service to our business partner.

1. If I want to put my brand on packing and products, what is the order quantity, is there any upcost?
There is no upcost for customized packing if the order quantity can meet MOQ
2. What is the nearest FOB port?
Ningbo
3. What certification you’ve got for overseas markets?
We’ve obtained CE/LVD,CE/EMC,GCC,CB,Rohs certification/test report for the products.
4. What is the delivery term?
It is always 25-30 days after the arrivals of L/C or 30% deposit payment.
5. I would like to know if ODM is acceptable.
Both OEM and ODM is acceptable
6. What is the nearest international airport if I would like to visit your factory?
Shanghai international airport is preferable.
New products from manufacturers at wholesale prices