PE PP plastic film agglomerator / agglomerator machine / plastic aglomerator

Share on (62400295237):


Price:

Quantity:


Product Overview

Description


Product Description

IMG_5751-.jpegIMG_5753.jpegIMG_5754.jpegIMG_0225.jpgphotobank.jpg

Product Detail

Weight1500kg
Heating MethodBy self friction
Plastic typeFilm,fiber
Motor power37-132(KW)
Processing capacity100-500(kg/h)
Mainshaft Speed680-1050 rbm
ApplicationFilm agglomerator
ColorSelectable
Knife structureFixed and moving knife

Aboutagglomerator

1.1Application:RSD-GHX-series plastic agglomerator is special designed and developed based on overseas advanced technology. To meet requirement of processing thermoplastic film, high-low-pressure polyethylene, polystyrene, thermoplastic polypropylene plastics and other waste products, which resolving problem of waste material recycling to achieve the aim of reducing cost and improving economic benefit.

1.2 Material characteristicsThe material to be treated:PP/HDPE/LDPE FILM agglomeration, Finished product: PP/ HDPE/LDPE floccules

1.3 Basic Infrastructure (Provided by customer)

a. Space: About 2500mm (length) ×1250mm (width)×1800mm(height)

b. Electricity network: 380V/50Hz, 3 phase (Adjustable according to your local voltage standard)

c. Wire/cables: wires/cables from customer’s general control cabinet to the main control cabinet for agglomerator; all electrical cable from the main control cabinet to agglomerator.

d. Cooling water supply: water hoses to agglomeratore.

e. Means for lifting the machines when unloading and positioning

f. Everything else not clearly mentioned aboveg. Manpower requirement: Qty. of labors: 1 person.

Packaging & Shipping

Vibrator

Company Information

Vibrator

Our Advantages

Vibrator

Exhibition

Vibrator

Workshop

Vibrator

Packaging & Shipping

Vibrator

FAQ

1) What's your guarantee or the warranty of the quality if we buy your machines?

We offer you high quality machines with 1 year guarantee and supply life-long technical support. 

2) When can we get my machine after we paid?

Normally production time is around 30-45days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.

3) How to install my machines when it arrives?how much the cost?

We will send our engineers to your factory to install the machines and train your staff how to operate the machines.

Customer pay air tickets go and back,accommodation and USD80/day/person.

4) How long time for installation?

According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

5) How about the spare parts?

We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.


0.2117 s.