D.O.T Brass Air Brake Nylon / Copper Tubing Include Sleeve Nut Branch Tee Run Tee Male Elbow Union Connector

Share on (62400355378):


Price:$1.20

Quantity:


Product Overview

Description


Product Description
Material
Brass(CA 360 Brass for Barstock fittings.,CA377 Brass for forged fittings)
Certification
D.O.T, ISO
Process
Barstock,Forged,Turning,Milling
Tolerance
±0.01-0.05mm
Surface Treament
Plain(or according to customer demand)
Surface Roughness
Ra25-100(or according to customer demand)
Testing
Large batch Spot-check,small batch full inspection
Production experience
16 years
Customize
Acceptable
Payment
T/T,Below USD 5000, full payment, USD 5000 above, 50% deposit, full paid before delivery
Delivery Time
3-15 days after receiving the deposit
Typical Application: Air brake systems except where temperatures exceed +200°F tubing.
or where battery acid can drip on
Pressure: Maximum operating pressure of 150 psi.
Vibration: Fair resistance.
Temperature Range: -40°F to +200°F (-40°C to +93°C)
Material: CA360 Brass.
Used With: NT100 Nylon Tubing - SAE J844 Type A and B. See page 27 for NT100 ylon Tubing data.
Advantages: Easy to assemble (no TUBE preparation or flaring required.) Built in TUBE support.
May be used with copper tubing by replacing nut, sleeve and insert with long nut
and spherical sleeve. Insert should be removed for copper tubing use.
DOT Air Brake Copper Brass Fitting
Dot Air Brake Hose Brass Fitting
DoT Air Brake Nylon Brass Fitting
Compression brass Fitting
SAE Brass Fitting
Recommend Products
Company Profile
Packing & Delivery
Our service
--- Any inquiries will be replied within 24 hours;

--- OEM is available;

--- High quality, standard designs, reasonable & competitive price, fast lead time;

--- Shipping: We have strong cooperation with DHL,TNT,UPS, etc;

--- Lead time: stock items could be sent out 3-5 working days after getting payment; OEM parts takes 30-90 days based on different drawing;

--- Label and packing service for AMAZON/EBAY retailer are acceptable.
FAQ
1. Is OEM parts acceptable?
Yes, we could do OEM parts according to customers’ 2D/3D drawing or samples;

2. Is Customized label acceptable? What is customized label?
Customized label is acceptable with quite low extra charge.
Very small MOQ for normal standard customized label. For some special label with different colors, we may ask for at least
500pcs;

3. What is the best lead time?
For stock items, the min lead time is 2 -3 working days after getting full payment from customers;
For OEM parts, normal lead time is from 2 weeks to 1.5 months, based on different design;

4. Shipping method
We have established long term relationship with many different logistic company, so customer could choose fast express such as
DHL, EMS, FEDEX, UPS, ARAMEX or standard small parcel like Epacket, China Registered Small Parcel, Russian air and so on;

5. Payment method
For small amount order, we accept fast payment method, such as paypal or escrow;
For order over $2000, normally we accept bank transfer to our offshore bank or company account;

6. Packing
We use different packing method, such as PP bag, carton box, wooden box, steel rack, pallet, and also other packing method
defined by customers;

7. Aftersales service
Normally we will give feedback to our customer within 48 hours if there are any problems;

0.195 s.