Farm Irrigation Hydraulic Water Well Drilling Rig Machine Kf 300

Share on (62403057760):


Price:

Quantity:


Product Overview

Description



Product Description


KF-300 tractor mounted water well drilling rig is powered by a tractor diesel engine. The working department of the drilling machine is integrated with the tractor. The tractor is both the drilling machine and the transportation vehicle. At the same time, the disel engine is also the working power of the drilling rig. When going to the work site, the tractor itself can also drag a trailer mounted air compressor, which saves the investment of transportation vehicles.


KF-300 can install air conditioner. It also equips dust collector to make working environment more friendly.


Lower cost, more convenient for work. A tricycle loading drill pipes can be equipped together.


Because the drilling rig is small and flexible, It is more suitable for all sorts of road condition such as off-road, village, the lane of the countryside, farmyard, etc. 


The main function of this drilling machinery is to obtain underground material data, for example, core of rock, core of mine, rock debris, liquid samples, gas samples.


It can be used for drilling water well, and geothermal well.


The system uses hydraulic power from tractor as the drilling force to realize the function of drilling. You don't need to turn on the air compressor when lifting the drill pipes, just use its hydraulic power of tractor.


 


Features:


1, Strong engine power: the drilling rig mounted with Levo tractor has sufficient power to ensure ordly drilling operation.



 


2, Welding machine setting: when drilling a disposable hole, no other power source and welder are required, It can be directly welded.



 


3, Remote control: convenient remote control plug for long distance operation ensures safety, health, convenient drilling and time saving.



 


4, Trailing braking system: the multi-purpose machine can drag air compressor, drill pipes, cargo box for long-distance driving. 



 


Basic technical data:

































































ModelKF-300Drilling diameter138 - 325mm
Drilling depth300mAdapt to rock hardnessF = 6 ~ 20
air working pressure1.05-3.0 MPaair consumption5-35 m3/h
Slide stroke2500mmGround clearance400mm
Maximum torque6500 N.mLifting force15 Tons
Boost speet40 m/minClimbing angle30 degree
weight6200 kgSwing speed60-110 rpm
Progressive efficiency15-35 m/hDrill pipe length2000 mm
Drill pipe diameter76/89/102 mmStratic height4650 mm
Adaptor impactorHigh wind pressureAir compressor20 m3/2.0 Mpa above

 


 





Application


_07.jpg 





Related Products


_06.jpg















About Us


_08.jpg 





Packaging & Shipping


_09.jpg 





FAQ


_10.jpg


1. Q: Are you trading company or manufacturer?


A: We are original equipment manufacturer.


 


2. Q: How long is your delivery time?


A: It is according to the model and quantity.Generally it is 3-5 days if the machines are in stock.It will be 15-30 days if you want to customize the machines.


 


3. Q: Do you provide samples? Is it free or extra?


A: Yes, we could offer you the sample machine.But it's not free. You need to pay for the sample and the cost of freight.


 


4. Q: What is your terms of payment?


A: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow etc.Payment<=USD 5000, 100% in advance.Payment>=USD 5000, 30% T/T in advance, balance before shipment.




0.2058 s.