Connect with the external power supply, start the program button, the main motor starts,the main motor automatically enters to the action state, the feeding machine is in operation, and it starts to push the cart forward, press the waste paper back, and the waste paper falls into the box again, then pressed again, The cycle is repeated, when the length of the package reaches the specified length, the pushcart stops at the front end of the package direction.









Before taking over, check the fixing of each main oil pump, pipeline, main controller, safety and switchgear, lining in 15 minutes; the protective cover on each hydraulic cylinder, and the protection of the rotating mechanism on the machine room and waste paper baler. Whether the cover is faulty; to check if all the extrusion stages are sick, check the amount of working oil in the tank and the lubrication of the working oil pump. In the lower part of each working oil pump tank, the cock is opened to confirm the water. The main oil pump lubrication system filter should be cleaned, check the signal device for faults, and idling and load operation check on the waste paper baler.
The air in the hydraulic system must be discharged at least once per shift until the working fluid is present. The working level in the fuel tank is not allowed to fall below the specified limit. The seal heat of the support bearing, the mouth sleeve and each hydraulic cylinder must not exceed 70 °C. When noise is found in each mechanism and device (for example, a crash in the valve, etc.), the waste paper baler must stop immediately. When working, you must pay attention to the quality of scrap steel installed in the extrusion chamber. It is not allowed to squeeze scrap steel that exceeds the thickness specified in the waste paper baler manual. Before starting work, it is necessary to find out what faults have occurred in the previous work units and whether they have been completely eliminated. To check whether the signal devices on the console are in good condition, always observe the readings of the pressure gauges and the display of the signal lights. Spent steel extrusion must be carried out at the pressures of the various stages specified in the waste paper baler instructions.
Always check the accuracy of the pressure relay operation and, if necessary, tighten or loosen the spring to adjust the pressure relay. To check the gap between the extrusion head and the side walls of the extrusion chamber, the gap value should not exceed 0.2 to 0.4 mm. Also check the gap between the shearer and the wall of the extrusion chamber. The maximum value of these gaps is 0.2 to 0.25 mm.
Check the correctness of the adjustment of the stage squeeze plunger synchronizer (if any). The center position of the plunger is determined by the principle that the gap between the two side wall faces of the extrusion head and the extrusion chamber is equal. In any case, the load of the synchronizer should not touch the bottom of the box.
Connect with the external power supply, start the program button, the main motor starts,the main motor automatically enters to the action state, the feeding machine is in operation, and it starts to push the cart forward, press the waste paper back, and the waste paper falls into the box again, then pressed again, The cycle is repeated, when the length of the package reaches the specified length, the pushcart stops at the front end of the package direction.