Complete Bottle Carbonated Beverage Commercial Soda Csd Cola Soft Drink Making Filling Bottling Machine Production Line

Share on (62419951463):


Price:$15,000.00 - $28,000.00

Quantity:


Product Overview

Description



Description and Flow




The machine is mainly used for filling carbonated drink. It combines rinsing and filling and capping as one automatic body suitable for PET or other plastic bottles. The iso-pressure (iso-barometric) filling technology is adopted enabling it to fill more efficiently and more stably with more output than the machine of the same level from others.


Flow




Sample




Technical Parameters


Model
DCGF24-24-6
capacity(500ml)
6000BPH(500ML)
Washing heads
24
Filling heads
24
Capping heads
6
suitable bottle
PET bottle,plastic bottle
Diameter ofbottle
φ55-110mm
Height of bottle
150-310mm
Weight
5000kg
Main motor power
2.2kw


Machine Details




Control System


S/N 
Name  
Brand
Country
1  
Main motor
ABB
Switzerland
2  
 Inverter   
MITSUBISHI  
Japan
3  
PLC
OMRON
Japan
4
Touch screen
MITSUBISHI
Japan
5
Contactor
SCHNEIDER
France
6
Thermo- relay
SCHNEIDER
France
7
Air-break switch
SCHNEIDER
France
8
Proximity switch
TURCK
USA
9
Photoelectric switch
BANNER
USA
10
Air circuit system
SMC
Japan
11
Water pump 
Southern     
China


Complete Filling Line


Water Treatment System
Preparation system
Drink mixer


CIP System
Automatic Bottle Blowing Machine
Carbonated drink filling machine


Warm machine
Dryer
Laser printer


Sleeve Labeling Machine
Shrink Packing Machine


About U TECH








Certifications




FAQ


Q1:Do you have any reference project?
>> A1:We have reference project in most countries, and you can visit their factories if we get the permission of the customer.

Q2:What's your guarantee or the warranty of the quality if we buy your machines?
>>A2:We offer you high quality machines with 2 years guarantee . we will give u spare part free in 2 years.

Q3: Do you provide customized service?
>> A3: We will customize the machine according to your needs, materil ,power,filling type,the kinds of the bottles and so on.

Q4:When can I get my machine after I paid?
>> A4:We will deliver the machines on time as the date we agreed both side.

Q5:How can I install my machine when it arrives?
>> A5:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.



0.1954 s.