Diesel highway guardrail post installation safety barrier road fence pile driver machine

Share on (62421605313):


Price:$9,500.00

Quantity:


Product Overview

Description



Product Description


The loader type guardrail pile driver is a product developed by Hengwang Group according to the market demand and its own technology. It is a new product integrating loading, piling and drilling. Adopting a new design concept, carefully researching the overall function, and adopting the modularization and design concept, the wooden structure is completely enclosed, which is more conducive to the rapid installation and transition of the product. It can be widely used in the pile hole of road, high-speed and other road guardrails. Drill into the work.











                                                                                      PARAMETER
MODEL
HW-20
Power head 
65
Power 
37KW
Impactor 
110/150 Low wind pressure
Pile diameter 
110-200cm
Depth 
1.4-2.6M
Machine size 
5m*2.2m*2.74 m
Weight
4T 


Detailed Images


loader type guardrail pile driver







loader type guardrail pile driver can using following 





Packing & Delivery


loader type guardrail pile driver loading within container 





Certificate


loader type guardrail pile driver CE certificate 





Customer Photos




Our Factory


Our Factory Details 

Jining Hengwang Mining Machinery Co., Ltd. is located in Jining, Shandong Province, China. Established in 2002, comprehensive enterprise, collection of marketing, scientific research, trade. Registered capital of 10.8 million, Existing staff 200 persons, including 3 engineering experts, senior software engineer 8 persons, network information technicians 28 persons, ecommerce division, more than 80 persons, the international trade commissioner, 18 persons, logistics division 9 persons, all kinds of technical personnel more than 50 persons. 









FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us as below.



4.3976 s.