Factory Directly Wholesale 5L LCD Panel Electric Thermo Pot Electric Kettle Water Warmer Thermo Pot

Share on (62434521861):


Price:

Quantity:


Product Overview

Description


5L Stainess Steel Thermos Pot Auto Keep Warm Electric Kettle

Model No.:PCF-60HM(U)Type:Water Boiler and Warmer
Size: 28*22*41 cmNet Weight2.6 kgs
Voltage:220V-240VPower:650W~700W
Body Material:

Brand New PP Plastic+ Tin Metal Outer Shell

OEM Acceptable

Inner Material:

Brand New #201 Stainless Steel

OEM Acceptable

M.O.Q: 1000 SetsPayment :T/T, L/C
Delivery Time:

40 days after confirmed the deposit or original L/C, 

and confirm all the artwork

Shipping Port:Jiangmen Port, CHINA
Packaging:Each electric thermo pot in a color box, 6 boxes in carton. 

Carton measurement:  76.7*55.7*46 cm.

Qty of 20' GP: 762 sets; Qty of full 40' HQ: 1800 sets

 

Product Description

 -3.jpg

 

Applicable scene

3_01.jpg 

Product Overviews
Company Information

3_06.jpg3_08.jpg 

Packaging & Shipping

3_10.jpg 

Certifications

 

 

 

 

046.jpg

 

 

 

057.jpg

 

 

 

 

FAQ

Q: Are you manufacturer or trade company?

A: We are the Manufacturer, specialized in Manufacturing Electric thermo pot, Blender, Juicer, Mixer, Grinder, Chopper for over 20 years.

Q: How can I get the samples?

A: We appreciate that if you can accept to pay the sample freight and sample cost.

Q: How much the transportation freight of samples?

A: The freight charge depends on the weight and packing size in your area.

Q: what's the delivery time for the sample?

A: The samples will be ready for delivery within 7-10days.

Q: Do you offer OEM&ODM service?

A: Yes, we do. we offer OEM&ODM service.

Q: what's the delivery for the order?

A: Depends on your order quantity. Generally 30-45 days after confirm the deposit and all the artwork.

Q: How to pay the money?

A: We accept pay by L/C or T/T. All prices will be based on FOB Jiangmen Port.

Q: what's the shipment method?

A: Ocean Shipping. You could choose the forwarder of your own, and we can recommend some of our forwarders to you.

Q: How do your factory control quality?

A: Quality is the most Important for us. Our factory already gained the ISO certificate, and most of our products gained the CB, CE, RoHS, LFGB.

Q: Could you please make It clear to me about your payment term?

A: Sure. Please find below details:

Payment terms: L/C, T/T (FOB JIANGMEN Port)

Payment condition: 30% deposit in advance, 70% balance before delivery

Delivery time: 30-45 days after deposit and artwork confirmed

 


0.192 s.