Atmospheric distillation process unit tower to naphtha and diesel

Share on (62435194046):


Price:

Quantity:


Product Overview

Description


Atmospheric distillation process unit tower to naphtha and diesel



Product Description


 


Henan Barui Environmental Protection Equipment Co.,Ltd, adopts The most advanced technology of China University of Petroleum Design Institute, export of crude oil refining equipment always walk in the forefront of the refining industry.  Atmospheric pressure and  Vacuum pressure unit, Reforming unit, Alkylation unit, Isomerization unit, hydrocracker unit, The process technology is advanced and the quality of  product oil can meets the international standard.


1, process flow drawings


 1 (2).jpg


 


 


2, crude oil refinery unit


750-2.jpg


 


QQ20180529144302.jpg


 


 3, Equipment  pictures


 


1-1.jpg


 2-1.jpg


5-1.jpg


 


 0.4.jpg


 


4, Equipment workshop and production 


0.5.jpg


 


 4-1.jpg





Packaging & Shipping


 




 Biodiesel G


 


 



Our Services


 


1. Professional service team to provide technical support for pre-sale, sale and after-sale.


2.  We will provide installation instructions on your working site, debug the plant and provide training to your workers.


3. 12 months quality warranty for main machine.


4. 24 hours feedback response: solve your problems online or on your working site.


Custom visiting 


750.jpg


 crude oil refinery1.jpg


 




 



Company Information


 


 


scrap tires recycling


 


 


 





FAQ


   What is the warranty of the machines?
12 months free guanantee and life long standard paid service.
What is the raw material of your machinery?
Stainless steel ,Carbon steel and Boiler steel .
When can I get the price?
Within 24 hours, if urgent, please directly contact us.
How to ask quotation?
Please inform us your crude oil specifications and your target capacity per day, then we will send our proposal as soon as possible.
Can we visit the oil plant of  case factory ?
Yes you can! We have many case factories at home and abroad to visit.
How many areas are required to build the plant refinery? 
The land area required usually depends on the capacity of your plant. We can calculate the area needed and give you the plant designs.
How long will it take to get my products?
In general, it will take us 45-120 days to make the machinery, and 3-7days to shipping port.
Can you install the production line and train our stuffs for free?
Yes we can. we'll send engineers to help you install the equipment and train your workers freely.





Certifications


 crude oil0.jpg




0.1846 s.