Share on (62441609395):
Name | used construction equipment steel Frame Scaffolding System |
Type | E-frame , H-frame a frame scaffolding |
Material | Q235, Q345 Steel |
Surface Treatment | Painted , Pre-Galvanized, Hot Dipped Galvabized ,Powder Coated |
Main Component | Frame ,Catwalk ,Joint Pin ,Cross Brace ,Base Jack ,U-head Jack And Castor |
Specification | Main Pipe :42*1.5/1.8/2.0/2.2 mm ; Inner Pipe : 25*1.5/1.8/2.0 mm etc |
Cross Brace | 21.3*1.2/1.4 mm etc as request length |
Joint Pin | 36*1.2/1.5/2.0*225/210 mm etc |
Cat Walk | 420/450/480mm*45mm*1.0/1.1/1.2/1.5/1.8/2.0mm |
Application | Matching with frames, joint pins, base jack, u-head jack, catwalk, stair, etc,as working platform for construction, indoor&outdoor decoration, housing maintenance, etc |
OEM is available | |
E Frame ( Door type frame)

H Frame ( Ladder type frame)

Scaffolding Frame | ||
Model NO. | Specification (H*W) | Weight |
E-Frame Scaffolding (Door-type frame) | 1930*1219 mm | 12.5/13.5 kg |
1700*1219 mm | 12.5/13 kg | |
1700*914 mm | 10.8 kg | |
1524*1219 mm | 11 kg | |
H Frame Scaffolding (Ladder-type frame) | 1930*1219mm | 14.65/16.83kg |
1700*1219 mm | 14/14.5 kg | |
1524*1524 mm | 13-14 kg | |
1219*1219 mm | 10 kg | |
914*1219 mm | 7.5 kg | |



Cross Brace Description:
Item No. | AXBXC | Reference Weight |
JSCW-001 | 1219x1524x1952mm(21.3x1.5mm) | 2.9kg |
JSCW-002 | 1219x1219x1724mm(21.3x1.5mm) | 2.5kg |
JSCW-003 | 1219x1829x2198mm(21.3x1.5mm) | 3.2kg |
JSCW-004 | 610x1219x1363mm(21.3x1.5mm) | 2.0kg |
JSCW-005 | 610x1219x1928mm(21.3x1.5mm) | 2.8kg |
JSCW-006 | 914x1829x2045mm(21.3x1.5mm) | 3.0kg |
JSCW-007 | 610x1219x1524mm(21.3x1.5mm) | 2.3kg |









1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
5. Q: Are you manufacturer or trader?
A: We are production and trade integration of construction materials for 19 years.
6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding steel pipes
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork
New products from manufacturers at wholesale prices