Electric vehicle bridge axle with differential

Share on (62460458995):


Price:$268.00 - $286.00

Quantity:


Product Overview

Description



Product Description


Electric vehicle bridge axle with differential







Total Length   X (mm)
Customized
Center Distance   Y(mm)
Customized
Speed Ratio
6:1/8:1/10:1/12:1/11.76:1/12.76:1
Brake  (mm)
Φ220/Φ180
Placement Method of Rear Axle
Horizontal/Vertical
Installation method of Motor
Preposition/Postposition
Rated Load
1T-2.2T
Adaptable Motor
Below 15KW


Customers visit






Other Products






Application Industry






Our Certification


Our company has obtained a number of certifications such as the ISO 9001:2015, IATF 16949:2016 from NSF International Strategic Registrations, the certificate of scientific and technological achievements , the Advanced Technology Enterprise and Henan province science and technology type small and medium enterprise certificate.





\t\t\t\t\t\t\t\t\tOur Equipments \t\t\t\t\t\t\t


In order to ensure the quality of Factory price customized XBQ-1002 rear axle motor, we have developed a complete axle production line and introduced many advanced equipments from Germany, Switzerland, Italy and Japen .Including the spark spectrum analyzer,electrophoretic coating equipment, Hexagon coordinate measuring instrument, rear axle comprehensive test bench, metallographic analyzer,   Leshalle gear grinding machine, Qinchuan develops gear hobbing machine, CNC grinding machine.





Axle production line















Spark spectrum analyzer








Electrophoretic coating equipment








Hexagon coordinate measuring instrument








Rear axle comprehensive test bench








Rear axle comprehensive test bench




Packing & Delivery


The products will be packed in the wooden case.







FAQ


Q:Are you trading company or manufacturer?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 10-45 days if the goods are in stock. or it is over 30 days if the goods are not in stock, it is according to quantity.


Q: What is your terms of payment ?
A: 30% Advance payment by T/T after signing the contract.70% before delivery.



0.2089 s.