Share on (62476773985):





Item | Specification |
Model | M-A-10 |
Gross area | 78㎡, 124㎡,164㎡ |
Main frame | Q 550 Galvanized Steel, Q 350 cold-formed steel |
Demension | 14 m × 15 m |
Steel thickness | Column: 2 mm, beam: 1.5 mm, roof: 1.0 mm, ceiling: 0.8 mm. |
Pillar /beam distance | ≤ 4 m |
Wind resistant | 12 Grade, Wo =0.67 kN/㎡ |
Seismic Resistance | 7 Grade |
Lifespan for structure | 50 years |
Floor load capacity | 2.84 kN/m2 |
General Lifetime | 50 years |
Connection method | Bolts and screw between steel. |
Installation period | Around 12 days by 5-6 experienced workers |










WOOD CUBE FLOOR VS TRADITIONAL FLOOR | ||||
Item Name | Traditional Floor | Wood Cube Floor | ||
Material | Steel beam+ floor slab+ shear nail+ concrete+ leveling layer+ finish board | Angle steel+ floor slab+ finish board | ||
Construction Technology | Complicate wet construction | Easy dry construction | ||
Ceiling | Complicated | No need keel, can hide the lights and improve fireproof level by using gypsum board | ||
Object Weight | Around 240 Kg/㎡ | 30 Kg/ ㎡ | ||




Item Name | Wood Cube House | PK | Timber House | Container Steel House |
Material | Q 550 galvanized steel+ aluminum PU sandwich wall panel+ PU corrugated floor and roof | Wood | ||
Environmental protection | 1.100% dry construction 2. No painting 3. 98% repeated used 4.Whole house thermal break insulation | 1. Mass felling of trees 2. Poor recovery 3. Lots of construction waste and dust 4. The painting contains formaldehyde | 1. Lots of steel are needed 2. The painting which contains formaldehyde is unavoidable | |
Comfortability | 1.Imitation of wood. 2. Modern appearance, elegant interior design reaches four star design standard. 3. Ventilation system. 4. Whole house thermal break. 5. Various of wall color options brings different design effect. | 1. Origin wood ,natural texture, simple color,lack of color matching 2. Comfortable | 1. Poor insulation, high energy consumption for air conditioner. 2. Noisy when raining. | |
Service Life | 50 years | 5-10 years | 6-8 years | |
Installation Period | 1.5-6 workers can install a 30 square meters house per day. 2. One project can operate within 30 days. 3.Some models support hanging transportation. | 1. Long construction period, light, water and heating will take extra time. 2. Will take at least 150 days for one project | 1. Fast installation. 2. Hanging transportation is available. | |
After Service | 20 years guarantee, a full set of installation tool for free, technician and assembly team | N/A |








New products from manufacturers at wholesale prices