Plastic Hollow Concrete formwork widely used on wall column and foundation formwork maximum fresh concrete pressure 50KN/m2

Share on (62492004163):


Price:

Quantity:


Product Overview

Description


Product Description
The latest material sciences PP
Shicheng has been carrying out research and development in polymer products.In so doing,the focus has been on the pratical application of these materials in construction engineering.The result is a composite material on the basis of polymer matrix.
Size (mm)
Thickness (mm)
Weight (kg)
915×1830
14
13.5±0.5
915×1830
15
14±0.5
915×1830
16
15±0.5
1220×2440
14
24±0.5
1220×2440
15
25±0.5
1220×2440
16
27±0.5
1220×2440
18
29±0.5
1220×2440
20
31±0.5
Our Advantages
Low weight
The material is very light compared to steel or wood.This lowes for faster,more ergonomic working and saves on crane time requirements.
High flexibility regarding product design
The using formwork process allows the components to be formed in an extremely flexible way.
High durability against moisture
PP are shrink free,develop no moisture expansion and do not rust.This makes their use in formwork and scaffolding applications so advantageous compared to wood or steel.
Zero waste production
The entire material used is processed into the product.No waste is generated during production.Leftover material and old formwork can be recyle used.
Transport weights
Products made of the polymer-based composite are very light.This minimises the transport weight as well as transport costs
100% Recyclable
All components are 100% recyclable.Used material can be used to manufacuture new products in terms of a sustaninable recycling economy.
Detailed Images


Installment and operating instrucitons

Use the same thickness of formwork For example:Use the hollow building formwork intersecting laid with 15mm thickness.
  • Wood poles distance

1.Wood square of the distance on the surface of the intersection spacing wood square distance according to the thickness of the slab concrete in general the thickness of less than 0.15m floor spacing is 200~250m.
2.The shear wall or sample using the formwork (15mm thickness spacing is 100~150mm if the shear wall pillar width more than 1 meter must add the fixed frame.
Splicing erection
Not leaving any gaps when splicing formwork,internal corner(wall bottom)portion must be used wood yoke that is easy to connect with beam\\wall\\templates.After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided.Installation 4 sides of Shear wall formwork must be completed erection as a whole block, after then lifting,lay flat.That can be reduces the labor intensity and have a good molding effect.



Using nails
When the nail to the formwork from the formwork edge distance 15~30mm, strength wants moderate nail is 40~50mmm in length should not be too long or too short.



Beam bottom handling method
Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance it does not leak slurry and wallboard material saving .
Packing&Shipping
Company Introduction
Shicheng is a search and development,design,production and sales of specialized plastic machinery manufacturing enterprises.We has been established for 13 years, with advanced technology,first-class processing equipment,has introduced the forefront of plastic machinery products.Shicheng through ISO9001 certifiacation in 2009;Via the CE certification in 2012\\2014\\2019;We won 11 patens,AAA lixin company, honesty and civilization private enterprise

Exhibition
Customer Photos

0.1972 s.