Snail Farming Agriculture Types 5th Generation Greenhouses Commercial Green House

Share on (62505792041):


Price:$8.00 - $10.00

Quantity:


Product Overview

Description





Product Description


Greenhouse frame
The greenhouse frame is made of galvanized steel, connected by screws, bolts or suitable connecter.

Covering material
1. Glass , thickness could be 4 mm or 5 mm.

2. PC(Poly-carbonate) sheet, hard and durable, anti-ultraviolet, available on the roof and the side of greenhouse,
thickness are 8mm, 10mm 12mm or 16mm.

3. Film, heat-preserving and durable, available on the roof and side of the greenhouse, thickness of which can be 100 micro, 120micro, 150micro, 180micro, 200micro, etc. And more than one layer of the film can be used on the greenhouse.


Multi-Span Greenhouse
Main Frame
Hot Galvanized Steel Pipe
Covering Material
Tempered Glass
Polycarbonate Sheet
PO/PE Film
Covering Material Lifetime
>10 years
5-10 years
1-3 years
Column Shape
Rectangular
Circular

Columns
Size
Thickness
Size
Thickness
50* 100 mm/ 60*120 mm/ 70* 140 mm etc.
1.5-3.0mm
Diameter of Φ25cm/ 32cm/ 42cm/ 48cm /60cm
1.2-3.0mm
Span
5-12m
Height
2.5-6m
Length
10-100m








Detailed Image


Optional system

Cooling system (cooling pad and fan)
Heating system (water, oil, coal heating)
Supplementary Lighting system (Philips sodium lamp)
Shading system (inside and outside shading)
Irrigation system (drip irrigation, mist system etc)
Seedbed ( movable, fixed )
Ventilation system ( roof and side windows)
Circulation System
Control system ( control all system running situation)


Systems



FRAME SYSTEM
1. Hot dip galvanized steel structure;
2. Stable structure, high intensity;
3. Assembly without welding;
4. Excellent anti-corrosion effectiveness;
5. Customized design and high quality material;
6. Good aging resistance;
7. Long life time, assemble easily.



COVEROING SYSTEM
1. 100 micron,150 micron, 200 micron plastic film;
2. 8mm, 10mm, 16mm polycarbonate panel;
3. High impact resistance;
4. Strong weather resistance;
5. UV block treatment.



SHADING SYSTEM
1. Shading rate 55%,60%,70%,80%,100%
2. The light is reflected by the aluminum foil on the surface of the shading curtain;
3. During the light-dark period, unwanted light accumulation can be prevented;
4. UV guarantee 5 years.



VENTILATION SYSTEM
1. Side wall ventilation and insect net;
2. Top floor ventilation and insect net;
3. Manual or electrical control;




COOLING SYSTEM
1. Cooling fans and cooling pads;
2. The cooling fan is installed on one side wall of the greenhouse, the cooing pad in the opposite;
3. With air circulation fan;
4. The temperature can be cooled down about 10 degrees, which can maintain the temperature in the greenhouse at 20-26℃ in summer.



IRRIGATION SYSTEM
1. Drip irrigation system;
2. pray irrigation system;
3. Pumps and fittings.



LIGHTING AND CONTROLLING SYSTEM
1. High pressure sodium lamp, or LED lamp;
2. Semi-auto control or intelligent control.


Why Choose Us



Sichuan Green Triangle Technology CO., Ltd., a greenhouse company based in Chengdu China, has been specialized in greenhouse industry for decades.

Our manufacturer was founded in 1995, representing 26 years of experience in the market, and our mission is to provide products of the high quality and the best service to our customers worldwide.

We offer all the different types of greenhouses, every complementary system and spares related to greenhouse with guarantee and shipping worldwide.
Our professional team is qualified to support you and solve any question that you may have.





Our service


OUR SERVICE
1. Answer clients' inquiry of the greenhouse;
2. Design the greenhouse according to clients specific situation and requirement;
3. Produce the greenhouse;
4. Installation drawings;
5. Arrange shipment for clients if needed.
6. Send our engineers or workers to client's site for installations.
PACKAGING & SHIPPING
1. All the steel material is nude packing;
2. Motor and electric machines are put in carton.;
3. Small steel parts are put in bag.;
4. Glass is put in iron frame;
5. All the material put in containers;
6. We provide clients world wide shipping with on-time delivery.


FAQ


1. How long is the delivery time?
The delivery time is from 10 days to 60 days after getting deposit. It depends on the greenhouse size.
2. How long is the warranty period?
We will supply free spare parts if any problem occurred in 12 months after installations.
3. Can you supply sample?
Yes.
4. Can your company supply greenhouse design?
Our company can offer greenhouse design according to your land and plant. And detailed installation drawing could be offered after deposit.
5. How to install greenhouse?
We will send our engineers to clients’ site for guiding the installations.
Client should hire enough local workers for the installation work.
6. What is the payment terms?
Generally 30%-50% TT deposit, and the balance by TT before loading.
Or advise your payment term, then we can negotiate it.


0.0226 s.