Water conservancy project, new and old roof, warehouse, tunnel, underground parking lot, swimming pool, kitchen, toilet, drinking pool, etc.
Product Features
1. Non-toxic and odorless, environmentally friendly products 2. Able to cover the base surface micro-cracks, against a slight vibration and displacement of the base surface 3. Bonding properties in the wet base surface construction 4. UV resistance performance 5. Follow-up construction of plaster and paste tiles directly on the waterproof layer
Method of use
Matters needing attention
1. Preparation good coating had better in eight hours after use. 2. Every time the construction should be in the first two times construction 3 to 4 hours. 3. Mixed good coating with sand nets filtering effect is better.
4.According to the coating standard construction, coating uniform, can not be under 0℃ or rain construction, coating film after dry solid should be done to cover layer.