Share on (62535413433):

• The use of coiler the steam circulation indirectly heat or steam directly heat , make the pot temperature more uniform.
• the soup of pan do not need to discharge When cooking, it can be used continuously; The energy is saved.
• There is insulating layer outside of the pot. lt can prevent heating lose and worker operation is scald
• The door is hydraulic type instead of old flange type. lt has the light electricity limit ,safety interlock and interlock function.
• The door is sealed by gland bush. Sight glass is installed on the top , water level used for soup supply.
• One hydraulic station is used by several machines, so it can be operated easily and cost is saved greatly.









We will delivery your goods by LCL/20' FCL/40'FCL depending on your order. Before delivery, our professional engineer will do trial run for each machine to check and confirm everything is workable, you also can come to our factory for testing together with us.when loading, our workers will fix the machine tightly in the container to ensure the safety in the transportation.

Ritong is always devoted to the entire solution of sterilization equipment for food, beverage, pharmaceutical as well as chemical industries; by now Ritong has grown into a mature entreprise in food industrial equipment, which integrades elements from raw material supplying, product development, technological design, manufacturing, finished product inspection, engineering transportation to after-sales service providing. Our premium sterile equipment mainly cover water spray retorts, water immersion retorts, pilot retorts, steam retorts, continuous sterilization equipment, etc. We are also excellent in customizing client-specific retorts according to your requirements. We assure you Ritong will satisfy global purchasers with our best quality, most cutting-edge technologies and most complete after-sales service.

A: We are factory.
A: Generally it is 30 day per set retort; the special power not same to 380V/220V/50HZ, it is 50 days per set retort.
A: When production, we have water pressure test and x-ray inject welding room;
When finish the retort, China gornment workers inject again;
Before delivery, we connect water, steam and compressed air to test like work in site.
We will arrange one or two professional engineer to customer's factory for establish and training;
We supply the full set professional operate manual;
PLC operate language is Chinese, English, Spainish, Korea, Vietnam.

New products from manufacturers at wholesale prices