Share on (62550329396):
Part 1
General Description of 2000L Brewery system
------ Quality Design for Craft Brewing
1. Description:
2000L 20HL Red Copper direct fire heating 4 vessel automatic beer brewing system is often used in micro breweries or bars. The system consists of four brewhouse vessels---Mash Tun and Lauter Tun and KettleTun and Whirlpool Tun. Mashing process is worked in one tank and lauter process is worked in one tank, and the kettle process is worked in one tank and whirlpool process worked in one tank, this configuration can have a high productivity.
This system usually brews one batch per day. If the second batch is required,it will need about 2 hours more. This system can cope with a temporary increase in production but not suitable for planned multi-batch brewing.
According to different fermentation time, usually 6 sets of 4000L fermenters or 12 sets of 2000L fermenters can be configured. 4 sets of 4000L fermenters and 4 sets of 2000L fermenters can also be configured to meet the needs of various beer types.
This brewery system also needs to be equipped with a complete automatic control system, malt milling system, CIP system,glycol cooling system, direct fire heating system, air system, etc.

2.Our Advantages:
1) Passed ISO TUV SGS production process inspection, Tiantai beer equipment meets the GB CE PED ASME standard
2) Five years guarantee for a long time sales service
3) Local service in EUROPE, AUSTRALIA ETC
4) 0 trade risk verified by more than 1100 breweries
5) Direct food grade completely certificated 304 stainless steel

3.Features:
1) Four vessels with hot water tank, 2000L per batch, the first batch takes about 8 hours, and two batches in 10 hours is allowed ;
2) Completely SUS304 stainless steel material, easy to clean; Red copper outside can also be used to adapt to special environments such as bars;
3) Direct fire heating and kettle process can get high thermal efficiency;
4) The wort is cooled by city water and -5 degrees glycol water in two stages, and it can also be designed to cool in a single stage;
5) Brewhouse heating temperature and fermentation cooling temperature are automatically controlled, manual control can be switched at any time;
6) Manual valve control, humanized operation, low investment, high cost performance; PLC automatic control can be optional;
7) Filling system can fill stainless steel beer barrels, glass bottles or cans

4. Technical Details:
Part 1: 500-800kg/hr Malt Milling Unit | ||
| 500-800kg/hr Malt Miller | 1set |
| Flexible Auger | 1set |
| Milling Controling Cabinet | 1set |
Part 2: 2000L Four Vessel/HLT Brewhouse | ||
| 20HL Mash Tun | 1set |
| 20HL Lauter Tun | 1set |
| 20HL Kettle Tun | 1set |
| 20HL Whirlpool Tun | 1set |
| 40HL Hot Water Tank | 1set |
Part 3: Fermentation Unit | ||
| 4000L Fermentation Tank/Unitank | 4sets |
| 2000L Fermentation Tank/Unitank | 4sets |
| 4000L Bright Beer Tank | 1set |
| 4000L Bright Beer Tank | 1set |
Part 4: Glycol Cooling Unit | ||
| 4000L Glycol Water Tank | 1set |
| 8HP Glycol Water Chiller | 2sets |
| Glycol Water Pipeline | 1unit |
Part 5: Electric Control Unit | ||
| Brewhouse Control Cabinet | 1set |
| Fermentation Control Cabinet | 1set |
Part 6: 200L Portable CIP Cart [Two Tanks] | ||
| 200L Single Wall Caustic Tank | 1set |
| 200L Single Wall Acid Tank | 1set |
| Sanitary Centrifugal Pump | 1set |
Part 8: Keg Filling Unit | ||
| 1-Station Keg Filler | 1set |
| 2-Station 2-Tank Auto Keg Rinser | 1set |
Part 9: Bottle Filling Unit | ||
| 8-Station Automatic Bottling Machine | 1set |
Part 2
More details of 2000L Brewery system
------ Quality Design for Craft Brewing






Glycol cooling system

CIP Cleaning system

PART 3
Learn More about TIANTAI
------ Your Honest Brewery Equipment Builder!

5.Tiantai Service
√ | Free consultation service before, during, and after sales |
√ | Project planning and design services |
√ | Free debugging instruction of equipment until everything is functional |
√ | Management of equipment's long distance shipping from seller's factory to named port or station by buyer |
√ | Training of equipment maintenance and operating personally |
√ | New production techniques |
√ | Provide 36 months complete warrantee for main parts and life-time maintenance service; The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare and wearing parts are attached with the machinery for free |

6.Packaging & Shipping
Delivery Time: 30-35 working days
Packing: Wooden/Veneer case for LCL; Plastic film wrapped and iron frame fixing for FCL
Shipping: provide home delivery service or arrival ports



New products from manufacturers at wholesale prices