Share on (62561476824):
Specifications
Industrial Tunnel Instant Freezer
1 perfect freezing effect, suitable for various food
2 High efficiency, meets food standar

1. general introduction
Industrial Tunnel Instant Freezer
This industrial tunnel instant freezer is a kind of individual quick freezing machine with advanced design and excellent performance. It possesses the advantages of energy saving, high efficiency and can preserve the food to the best extent. Its outstanding features are mainly in two aspects: 1. Large freezing area; 2. Wide application. You can freeze the food with different freezing way with this machine, like individual freezing, plate freezing. The industrial tunnel instant freezer uses totally closed air channel structure. The air blows from all direction, thus, improving the freezing efficiency and quality, making the food freezing more perfect.
|
Model |
Freezing capacity(kg/h) |
Cold |
Installed |
Length(m) |
Width(m) |
Height(m) |
Mesh belt |
|
SD100 |
100 |
15 |
2.3 |
7 |
1.5 |
2.1 |
1 |
|
SD150 |
150 |
21.5 |
3 |
8 |
1.8 |
2.2 |
1.3 |
|
SD300 |
300 |
43.5 |
6.5 |
11.2 |
2.3 |
2.3 |
1.8 |
|
SD500 |
500 |
75 |
10.3 |
13.5 |
3 |
2.5 |
2.5 |
|
SD1000 |
1000 |
142 |
19.8 |
21.5 |
3 |
2.5 |
2.5 |
|
SD1000A |
1000A |
165 |
20.2 |
18.5 |
3.5 |
2.5 |
3 |
|
SD1500 |
1500 |
225 |
28.6 |
26.4 |
3. |
2.5 |
3 |

2.Application of the industrial tunnel instant freezer:
The industrial tunnel instant freezer is widely used in freezing food in strip , block , flake or pellet shape, such as shrimp, potato chips, asparagus, fish, tubers, dumplings, dumplings, spring rolls, cutted meat, and chicken etc.

3.Features of the industrial tunnel instant freezer:
1. finished product will not stick together, in full compliance with the export of food hygiene standards.
2. uses air convection technic, short freezing time of 3-60 minutes.
3. The air blows from all direction, thus, improving the freezing efficiency and quality, making the food freezing more perfec.
4. Air cooler uses the overall copper tube aluminum set, extending equipment life , improving food hygiene and frozen efficiency .
5. Insulation effect is remarkable, elegant appearance.
1.We guarantee that the commodity hereof is made of the best materials and new brand with top
workmanship, and in accordance with quality specification stipulated in product Contract and
Appendix.
2. Guarantee period shall be within 12 months from the date of acceptance. During this period, if
there are quality problems, we will provide solution by verbal or written communication. If the
problem is unsolved, our engineers will repair for you on site as soon as possible. The
maintenance is free when there are non-operation errors; otherwise it is for the buyer’s account.
Q1.What does your company supply?
A1.Shandong XinGuanRun Food Industry Equipment Machinery Co.LTD.is a professional manufacturer and supplier of packaging machines,including thermoforming packaging machines MAP modified atmosphere packaging machines ,vacuum packaging machines.
Q2.Do you have any certifications for your products and your company?
A2.Yes,we have CE certifications,ISO9001,ISO14001.
Q3.The power supply in our country is different from that is in china,so I`m worrying if I could use the machine in my factory?
A3.Please don`t worry about this.we customize every machine to make sure they are in accordance with local power supply.You can use the machines without ang problem.
Q4.How long can I receive the machine if I make an order?
A4.The leading time is different,depends on machine type and production schedule.Usually,leading time for thermoforming packaging machine is 15-30 days;leading time for inline automatic MAP machine is 10-25 days;leading time for vertical MAP machine and chamber vacuum packaging machine are 5-15 days.
Q5.I`d lile to visit your factory,how can I easily find your location,and what`s the route to your factory?
A5.You are very welcome to visit our factory.Our location is zangkejia rod Tuqiang Industry Park,Longdu subdistrict ,zhucheng,shandong,china,262200.Our nearest airport and railway station is Qingdao,a 2 hour`s drive way.It takes 2 hours flight from shanghai to Qingdao,4.5 hours flight from Guangzhou to Qingdao.
New products from manufacturers at wholesale prices