Share on (62593576829):
SPECIFICATIONS FOR HZS50 CONCRETE BATCHING PLANT | |||
Main Mixer
| Model | JS1000 | 1000L |
Discharging height | L | 1000 | |
Power | kw | 2*18.5kw | |
Batcher Machiner
| Model | PLD1600 |
|
Aggregate storage bin | m3 | 8.3 | |
Weighing hopper | m3 | 1.6 | |
Weighing system | Aggregate capacity&accuracy | kg | 3000kg |
Cement capacity&accuracy | kg | 600kg | |
Water capacity&accuracy | 250kg | 250kg | |










Q1: What is the function of the concrete batch plant?
Answer: It is used to produce all kinds of concrete to meet the building work of buildings,bridges,dock,airport, railway,etc
Q2: How to choose the suitable model of batch plant?
Answer: Just tell us the capacity (m3/h,t/h)of concrete you want to produce concrete per hour or per month.
Q3: What paymet terms you use?
Answer: Usually the world most common used T/T,L/C ,etc
Q4: Do you supply other products?
Answer: Yes, we have . please see the following chart :
| NO. | Product Name | Type |
| 1 | Concrete Batching/Mixing Plant | Fixed and Mobile |
| 2 | Concrete Mixer | Twin Shaft, Single Shaft, Rotating Drum Type |
| 3 | Stabilized Soil Mixing Station/Plant | Station and Mobile |
| 4 | Asphalt Mixing Plant | From LB500 to LB4000 |
| 5 | Dry-mix Mortar Production Line | Full-auto |
| 6 | Concrete Batching Machine | Accumulative Weighing Type, Separater Weighing Type |
| 7 | Cement Silos | Fixed and mobile |
| 8 | Screw Conveyors | With universal joint |
| 9 | Concrete Mixer Truck | From 3m3 to 16m3 |
| 10 | Concrete Pump | Electric type and diesel engine powered |
| 11 | Brick Making Machine | Manual, Electric, Diesel |
| 12 | Wheel Loaders | ZL06-ZL50 |
| 13 | Construction Elevators | Single Cage and Double Cage |
| 14 | Tower Crane | stationary, mobile,outside-climbing, inside-climbing, horizontal-jib, luffing-jib, hammer-head, flat-top, |
Q1: How to use this dry mix mortar mixing plant?
A: As a professional dry mix mortar mixing plant manufacturer,we have many professional engineers, they will go to clients’ site for guiding the installation and test-running;also can teach you how to use the mixing plant properly.
Q2: What is the delivery time?
A: 30-50days after receiving advance payment
Q3: What is the payment terms?
A: T/T. L/C are all accept.
Q4: Do you have any cases abroad?
A: Yes, we imported to India, Vietnam,etc.
Q5: How many engineers do you have?
A: We have more than 30 engineers. when go to installation,have professional team to guide.
New products from manufacturers at wholesale prices