Share on:
DP-3400L Gasoline Road line Marking Machine, Line Striping Machine
Powered by LONCIN engine, 5.5hp gasoline engine (electric start by battery) which generate 4.0L output per minute.
Proven durable Piston Pump with Long-life V-packings,and stainless piston rod
The line width could be easily adjusted by different tip size, or the height / angle of spray gun
The front big wheel could be easily turned to any direction by the left handle controlled.
Improved wheel cart design with big size wheel for easy moving without vibrating .
Easy operate, easy control, and easy turn in any direction.
Fluid section has slower-stroking piston, slower cycle rate and larger displacement for longer performance life.
Ideal for most low to medium viscosity, waterborne traffic paints.
Versatile gun bracket can be positioned to spray on left, right, front or rear of striper.
Ideal fro small to medium-size line marking projects on athletic fields and pavement, parking lots, roads marking etc.
Technical data | DP-3400L |
Motor power | 5.5hp 4125Watts |
Max. pumping capacity | 4.0 L/min (1.1GPM) |
Max. nozzle size | up to 0,025″ |
Max. pressure | 227bar / 3300psi |
Volume | 24*81*93cm |
N.W./ G.W | 65/88kgs |
Q1:HOW LONG CAN I GET THE FEEDBACKS AFTER WE SENT THE INQUIRY?
Your inquiries will be replied within 1 working day.
Q2: WHAT’S THE PAYMENT TERM?
Sample order, 100% before shipment. Formal order, 30% deposit before production and 70% balance against copy of BL. Normally by T/T.
L/C at sight, Paypal, West Union is acceptable depends on the amount.
Q3:WHAT IS YOUR DELIVERY TIME?
Normally 7 days for the sample order, 25~35 days for the formal orders.
Q4:WHAT IS YOUR WARRANTY TERM?
1 Year warranty for main components(Easy damaged parts are not included.)
Q5:CAN I USE MY OWN LOGO AND DESIGN ON PRODUCTS?
OEM is available. The delivery time will be 35-50 days depend on order quantity and the MOQ will be different based on different models.
Q6: CAN I CHECK THE QUALITY OF GOODS BEFORE DELIVERY?
A:You can come to our factory or ask colleagues from your Chinese office or a third party inspection company to check the quality of goods before delivery.
B:We also can provide inspection report to you before shipping