HYCQ 63G 63A Automatic Changeover Switch ATS Switch 6A 10A 15A 20A 25A 32A 40A 63A ATSE Home use MIni Automatic Transfer Switch (847980620)

Share on:


Price:RUB 1,356.09
Price in USD:Details

Quantity:


Product Overview

Description

 

  

Product Description

 

Brand:   CSQ

Dual Power Automatic Transfer Switching Equipment 

Rated operating voltage:400V. 
Rated current:6~63A

 

1.Application 

 

HYCQ5-63G is terminal type automatic transfer device. It’s suitable for 3 phases 4 wires (or 1 phase 1 wire) dual power grid with AC 50/60Hz, rated voltage 400V/230V and rated current up to 63A. When one power goes wrong (only test normal Phase A voltage and reserve Phase A voltage, only test loss voltage or loss phase),it will automatic connect one or several load circuits from one power to the other power automatically, to ensure normal power supply of load circuits. 

The automatic transfer switch conforms to IEC60947-6-1 and GB/T14048.11

2.jpg

 

2.Normal conditions for operation and installation:

 

Environmental Temperature Condition:-5~+40°C

Installation site is not more than 2000 meters above sea level.

Pollution Level: Grade 3

Installation Category:  3

Vertical installation or horizontal installation

 

 

3. Main parameter

 

Rated Current Ie A

6,10,16,20,25,32,40

50, 63

Electrical Appliances Class

CB

Use Category

AC~33B

Tripping Current

5~10In (Type C), 10~15In (Type D),

Rated voltage Ue

220V (2P),380V (3P or 4P)

Rated frequency

50/60Hz

Rated short circuit connecting ability Icm (Peak)

9.18KA

6.615KA

Rated short circuit breaking ability Icn (effective value)

6KA

4.5KA

 

4. Appearance & Installation Dimension

 

 63H111

 

 

 

5. Terminal wiring diagram

 

63H222

 

 

6. Installation and wiring

 

ATS can be installed in power control cabinet directly. Users can wire after ATS installation (refer to design and use). As per current value use suitable conductor to connect the mains side (top terminal) and load side (bottom terminal) of MCB of normal electric power and standby electric power. In-phase parallel connection at load side, and ensure the phase sequence of normal electric power and standby electric power must be accordant (Wire as per A,B,C,N sequence). For 3 poles ATS should add one conductor with section not less than 0.3mm2  to connect theneuter line of power supply correctly, thus ATS can work properly. For 4 poles or 2 poles ATS, N pole of normal electric power and standby electric power should be connected to N pole of MCB respectively. In addition, when install ATS please ground reliably at grounding mark.

  

 

Company Information

_01_07_08_09_10_05 

847980620
0.0115 s.