Сохранить в закладки 10000007672034:

High Operating Efficiency 2800 rpm Speed Electric Fuel Type Construction Machinery Gasoline Concrete Vibrator
The powerful ALTRAMIX concrete vibrators offer just the right mid-frequency required to set material particles in motion fast for rapid consolidation of homogenous mixes.
The flexible 38 mm shafts have a rubber coated steel braided shaft outer and a hardened steel liner inner for long life.
The Electric motors are protected by a high strength cast aluminum housing that also dissipates potentially damaging heat.
| Model | ZN50FD-38 |
| Type | Electric |
| Matching shaft | 38mm |
| Power | 1.5 kw |
| Frequency | 50/60 Hz |
| Voltage | 220/380 Hz |
| Weight | 17-20 Kg |
| Material body | Iron |
| Start Mechanism | On/Off switch |
| Fuel Type | Electric |
| Size (cm) | 44*25*33cm |
| Speed | 2800 rpm |
| Flexible shaft length | 6 m |
| Package | carton |
| Warranty | 1year |
| Features | Commercial build quality Spiral hose protector 3-claw dog connection Heavy duty transport frame |




We are a trading and distributor company specialized in various equipment, tools, machinery and hardware for agricultural, industrial, and construction use. Our product range includes: diesel engines, gasoline engines, electric motors, welding machines, air compressors, power generators, alternators, power tools, hydraulic tools, workshop tools, hand tools, lathe machines, CNC lathe machines, milling machines, CNC milling machines, CNC cutting machines, Band saw machine, drilling machine. watering hose, irrigation hose, irrigation fittings, sprayer, agricultural sprinkler, water pumps, drippers, harvesting equipment, farm equipment, livestock equipment, spare parts, etc.



| AFTER-SALES SERVICE | |
| Available Spare Parts >> Fast Delivery! | |
| Transit Time to African countries | |
| 1 Day to | Algeria (Ghazaouet) |
| 2 Days to | Algeria (Oran) |
| 5 Days to | Tunisia, Egypt |
| 9 Days to | Benin, Mauritania (Nouadhibou) |
| 10 Days to | Guinea (Conakry), Senegal, Sierra Leone |
| 11 Days to | Nigeria (Apapa), Congo |
| 12 Days to | Nigeria (Lagos), Equatorial Guinea, Liberia (Monrovia), Gambia |
| 13 Days to | Cote d'Ivoire |
| 14 Days to | Ghana (Tema) |
| 15 Days to | Angola, Cape Verde, Togo |
| 17 Days to | Cameroon |
| 20 Days to | Guinea (Bissau) |
| 23 Days to | Gabon |


Новинки товаров от производителей по оптовым ценам